Roker Pier Repair Works

Award

Value

£236,117

Classifications

  • Pier construction work

Tags

  • award

Submission Deadline

6 months ago

Published

5 months ago

Description

Repairs to the Roker Pier coping and decking

You will need to create an account on Open in order to access and bid for public sector opportunities issued by Sunderland City Council.
Visit www.open-uk.org to register an account
(Registration is free and easy. Simply head over to www.open-uk.org and complete the online registration form).
Top tips to help you get started:
Keep an eye out for the temporary password to confirm your account - this is only valid for 3 days so if you have not logged in during this period, you will need to contact [email protected] to request a new temporary password
Adding your Companies House number will populate fields and make it easier to register
Once registered, select Codes & Categories relevant to your area of business
Add [email protected] to your safe sender list to ensure you don't miss out on notifications of relevant opportunities
The Open Hub is packed with resources and information to help you get the most out of Open. We have answered your questions in our FAQ section and developed a range of how-to guides so you can familiarise yourself with the system at your own pace.
Visit www.open-hub.org to find out more

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Oban Pier Upgrades

Northern Lighthouse Board (NLB) is looking for a contractor to complete upgrades to the timber beams at the pier at our NLB depot in Oban, PA34 4LS. The central section of the pier consists of a T-shape extension to the original pier added in the 1950’s. This provided a front edge of approximately 49m and allowed for berthing in deeper water. This was then extended in the early 2000’s to provide NLB with a larger operational surface area, extending the central section by approximately 10m and creating new eastern and western sections to the pier. All seaward faces have timber fender piles, though only the central section is currently used for berthing The scope of works required are as follows: •Replace 3 No. full pile with like-for-like 360x360mm greenheart pile, replacing brackets, bolts, nuts and spacers as required. •Replace 3 No. fender with heavy-duty rubber D-fender, replacing fixings as required. •Replace 6m of stair support waling with like-for-like 360x360mm greenheart waling beam, replacing brackets, nuts and bolts as required. •Replace total 40m of lower waling with like-for-like 360x360mm greenheart waling beam, replacing splice plates, brackets, nuts and bolts as required. •Replace 8m of cope beam with like-for-like greenheart members (210x210mm and 260x150mm), replacing fixings as required. •Replace 24m of cope beam with like-for-like greenheart members (300x150mm), replacing fixings as required. Potential replacement of galvanised steel ladders and access steps on a like for like basis will also be considered. We require the contractor to carry out the scope of works below: •Attend a mandatory site visit to Oban in September 2025 to fully understand the project scope of works and location. •Provide a detailed tender submission of how they will carry out these upgrades •Full installation of the repairs and upgrades by the end March 2025. Timeline Set out below is the proposed procurement timetable for this project. This is intended to be a guide and whilst NLB does not intend to depart from the timetable, it reserves the right to do so at any time. Issue of Invitation to Tender – 28th August 2025 Mandatory site visit at Oban depot – proposed Monday 8th September 2025 Clarification deadline for suppliers – 16th September 2025 Tender return deadline – 25th September 2025 Tender Award – by 15th October 2025 Site mobilisation – 24th November 2025 Completion of project – By end March 2025 To view this notice, please click here: https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=976586808

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete