238 - Structured Cabling Tender for Coleg GWent

Open

Buyers

Value

£100,000

Classifications

  • Networks
  • Electrical wiring and fitting work

Tags

  • tender

Submission Deadline

3 days from now

Published

3 weeks ago

Description

We are looking for a contractor to undertake the structured cabling for Coleg Gwent across all our campuses. All documents are on Bravo etendering portal .

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Dartmoor Multi Academy Trust Network Infrastructure Upgrade

Dartmoor Multi-Academy Trust strategic aim is to improve its services across 17 educational institutions, to achieve the guidelines set by the Department for Education (DfE). The initiative was prompted by the critical need for a resilient, secure, and high-performing digital infrastructure to support the Trust’s educational objectives. NGC Networks, in collaboration with Transformative were commissioned to undertake an audit of the Switch Level Network for each school and propose an action plan to deliver the improvements needed to deliver the project outcomes. Whilst the Trust’s aim is to deliver the improvements at all schools, this is likely to take a number of years over a phased approach due to the costs involved. Therefore, the Trust have initially prioritised works to be completed at the following two sites, with the tender being published by the end of the Spring Term 2025, with the works to be delivered during the summer holidays 2025. a. Holsworthy College b. Okehampton College Contractors are referred to the following that provides the DfE guidance that was used in the audit of IT infrastructure at each school site to identify the required standards and improvements: https://www.gov.uk/guidance/meeting-digital-and-technology-standards-in-schools-and-colleges A programme of AD surveys is being undertaken at all schools during the Easter holidays, with any required asbestos removal works being programmed in for the first two weeks of the summer holidays. Until these surveys are available, the impact of these works won’t be fully known. The current plan is to schedule in the IT infrastructure works for the remaining four weeks of the summer holidays. This timescale may be able to be extended if the IT infrastructure can be organised around the asbestos removal, for example, Okehampton has separate buildings on site. Or, if minimal or no asbestos removal is needed. The programme can be extended into future holiday periods to complete the works, but the Schools must be left fully operational in the interim. The current plan also needs to factor in the need to keep both colleges operational during the summer holidays due to central staff working, lettings and the management of exam results. There is a virtual Q&A on the 22nd April at 11am There are site visits, on Wednesday 16th April at Okehampton College and Thursday 17th April at Holsworthy College. Tenderers who wish to participate are requested to register for the virtual Q&A and/or the site visits via the tendering portal.

Katy Reed

Published 9 hours ago
Open

Plas Caerdeon Electrical re-wire works & fire alarm upgrade

The works comprise the electrical strip out and re-wire of Plas Caerdeon. It also includes the strip out and upgrade of the existing fire alarm system. It comprises of a Victorian manor house with communal GF areas including commercial kitchen as well as two upper floors which contain 15 dorm type bedrooms with separate shared bathroom facilities. There is also a separate converted stables and cottages which serve as self-catering accommodation for up to 17 people. The Project consists of the removal of the existing electrical wiring and outlets and replacing with new electric panel heaters and outlets/switches. The existing fire alarm system is to be striped out and replaced with a fully addressable system. It is the contractor's responsibility to design and specify the new fire alarm system and mange the works alongside the electrical installation. In association with these works there is a requirement to fill and make good all holes, penetrations etc. left by the removal of the old equipment, and also to the new equipment and cables provided by the new installation, paying particular attention to the Fire Strategy of the building and providing fire stopping where required, by a third-party accredited fire stopping contractor. In full compliance with the buildings fire strategy. As these works require decoration & making good, the University have requested that the decoration of all affected areas is included within the programme of works. In association with providing the new electrical panel heaters, socket outlets and switches to the building the following electrical works will also be required to facilitate the new installation.

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Gareth Tidmarsh

procurement.department@coleggwent.ac.uk

01495 333547

Timeline active

Publish
Bid
Evaluate
Award
Complete