PROVISION OF VOIDS AND MAJOR REPAIRS

Open

Buyers

Value

£0

Classifications

  • Building construction work
  • Roof works and other special trade construction works
  • Electrical installation work
  • Insulation work
  • Plumbing and sanitary works
  • Fencing, railing and safety equipment installation work
  • Mechanical installations
  • Plastering work
  • Joinery and carpentry installation work
  • Floor and wall covering work
  • Painting and glazing work
  • Other building completion work

Tags

  • planning

Submission Deadline

2 weeks from now

Published

1 month ago

Description

The Contract is to increase capacity in support of  (SCC) in-house teams in delivering voids, major works, planned works, disrepair works, response repairs & minor works to residential dwellings, civic buildings, and other properties, sites and assets owned, managed or leased by SCC; all to agreed standards and in a timely, consistent, cost effective and safe manner.
A more detailed description of the services required are detailed within this suite of documents but the categories/workstreams included within this tendering opportunity comprise:-
	Voids
	General Building & Maintenance Works;
	Roofing Repairs;
	Scaffolding;
	Glazing & Window Repairs;
	Drainage Surveys, Clearance & Repairs;
	Flooring;
	Locksmiths;
	Carpentry;
	Damp-proofing, Timber Treatment & Associated Repairs;
	Disabled Adaptions; 
	Electrical Installation & Repairs;
	Gas & Heating Installation & Repairs; 
	Minor Civil Engineering & Groundworks;
	Brickwork/Stonework & Associated Repairs;

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor's compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 1 day ago
Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor’s compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline planned

Publish
Bid
Evaluate
Award
Complete