Lot 1 - Park Community School - External Decorations and Repairs 13-24 - AWARD

Award

Value

£0

Classifications

  • Painting work of buildings

Tags

  • award

Submission Deadline

4 months ago

Published

4 months ago

Description

Dear Sir/Madam,
      
      In accordance with the Decoration & Minor Pre-decoration Repairs Framework 2024-2028 you are invited to tender for the External Decorations and Repairs 13-24 at Park Community School and have been supplied with the attached documents.
      
      Please download all the documents and read VERY carefully.
      
      Opting In and Out
      Please note you are required to 'Opt In' before you can access the 'My tender Return' to start populating your response. 
      
      The 'Opt Out' functionality will also be available throughout the duration of the tender process. Opting out will give you the option of declaring you no longer want to receive any further communication in relation to this tender along with the opportunity of providing comments and feedback for this decision.
      You can choose to 'Opt In' at any time during the tender process if you initially decided to 'Opt Out'.
      
      Your completed tender return document(s) and form of tender should be submitted via In Tend no later than 2pm on Wednesday 12th March 2025.
      
      Kind regards
      
      Matt Symonds

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Bass Rock Refurbishment 2025 - 2027

We have a provision of refurbishment of Bass rock lighthouse. This lighthouse is situated on a steep crag on the southern entrance to the Firth of Forth off the east coast of Scotland. The island rises out of the sea to a height of 107 metres and it is about a mile in circumference. It is an important nesting ground for seabirds, including 40,000 gannets. The island is accessed from North Berwick by boat with a concrete path leading from the steps at the boat landings up to the lighthouse through the ruins of the Castle walls. We require a competent contractor to carry out the scope of works as below, these are initial requirements and they may be added to in the tender documents. Lighthouse Tower refurbishment - Painting, internal and external – full building externally, decoration internally Glazing repairs – replacing window panes in light room Electrical upgrades – installation of new light, batteries and solar array Installation of HCL on roof dome Safety gates installed Asbestos testing Free issue equipment and detailed scope will be confirmed in the tender documents. External refurbishment Winch house at side of lighthouse tower to be removed, asbestos present in the roof Drainage – courtyard drainage repairs Wall removal Minor repairs to access landing and steps Bird guano removal Full details of the works will be given in the Tender documents. Contractors will need to confirm their competence in working at height, electrical works, and health and safety and environmental management. Due to nature Scotland restrictions in relation to bird nesting, access to Bass Rock for the works can only be between October and January every year. We expect these works to be carried out between these months in both 2025/26 and 2026/27. Access day to day will be by boat from the mainland, to be arranged by the awarded contractor. There are no toilets, overnight or fresh running water facilities on this site. Due to these limited welfare facilities and the PPE required to work on site, the works need to be carried out on site to a maximum of 4 hours per day. We will require all interested contractors to attend a mandatory site visit on 16th July 2025. We expect the following PPE to be supplied by NLB for this site visit – boat suits, breathing apparatus, lifejackets, personal locator beacons (PLB), Manta helmets. Interested suppliers are to wear waterproof footwear and clothing. Timeline Set out below is the proposed procurement timetable. This is intended as a guide and, whilst the NLB does not intend to depart from the timetable, it reserves the right to do so at any time. Issue of Invitation to Tender - 3rd July 2025 Site Visit - 16th July 2025 Clarification deadline - 24th July 2025 Tender return deadline - 6th August 2025 Tender Award - Estimated by mid-end August 2025 Tools and materials to Oban - By 10th October 2025 Contract start - 21st October 2025 To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=963528697

Katy Reed

Published 3 weeks ago
Open

Dynamic Purchasing System for Construction Contractors and Subcontractors and Ancillary Services

**IMPORTANT - This notice is a duplication of TED notice 278841-2019 published 12/06/2019 and TED change notice 522277-2023. This notice is to allow for the award of further competitions via the FTS System. Please note this is not a new notice** (copy link) https://ted.europa.eu/en/notice/-/detail/278841-2019 The Council of the Borough of Kirklees (including Kirklees neighbourhood housing identified as the 'Council' is seeking to establish a Dynamic Purchasing System (DPS) for construction contractors, subcontractors and ancillary services to undertake repair/ maintenance works/services for its portfolio of assets. The Authority have opted to establish a DPS as it is deemed the most appropriate option to meet its requirements and will enable a clear, consistent and compliant route to market. The DPS will be open to new entrants throughout its lifespan to allow coverage for ever changing requirements, including but not limited to new regulations and central government requirements. The procurement documents and subsequent updates are available for unrestricted and full direct access, free of charge, at: https://uk.eu-supply.com/ctm/Supplier/PublicPurchase/41778/0/ The DPS is anticipated to commence June 2019 for a period of 60 months, with a provision to extend the DPS for up to five (5) further twelve (12) month periods (the 'DPS Period'). The end date in FTS has been amended in accordance with the transitional arrangements of the Procurement Act 2023. The value of £154,000,000 represents the value as modified under change notice: 522277-2023. Please see further below for more information on the lots.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Property Category Management Team

[email protected]

03707 791404

Timeline complete

Publish
Bid
Evaluate
Award
Complete