Description

The Scope of requirements for design shall be to develop the designs to AFC 
status standard in accordance with the relevant Network Rail Standards and to 
provide a submission to NWR for Engineering Assurance.
The Scope of requirements for Construction shall be to implement the designs 
across the OHLE that is present on roads 1-3 in the maintenance shed at Allerton.
To view this notice, please click here: 
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=929757486

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Replacement of Boardwalk and Steps

We are seeking tender submissions for the removal of the existing boardwalk and steps, which includes a small outdoor classroom area with benches, and their replacement with a recycled plastic alternative. The space will then be used by children and local community groups for outdoor education and extra-curricular experiences. Summary of Works 1. The removal of the existing boardwalk and steps and removal of materials from site. 2. The replacement of the steps with a recycled plastic alternative, ensuring that they are sufficiently spaced so that they are accessible by children. 3. The replacement of the boardwalk, which includes a small outdoor classroom area and a small area surrounding a pond, with a recycled plastic alternative. This should include new foundations, ideally with ground screws to minimise disturbance and provide longevity to the boardwalk. 4. To complete the works during the summer holidays (2025) to minimise disruption to the wider school. The summer holidays begin on Monday 14th July and end Wednesday 20th August. 5. The overall budget for the works is £50,000. Tenders should be submitted, via email, no later than 15/04/2025 at 17:00 (GMT) to the project manager. Site visits can be organised, either with the project manager or another member of school staff (with a follow up telephone conversation with the project manager). Please email the project manager by 07/04/2025 to organise this. Tenders will be scored and the successful bidder informed, via email, within 10 working days of the submission deadline. Project Manager: Will Warley Email: [email protected] Telephone: +447415525429 0116 2832328

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete