Stoke Lock Fish Easement Design

Award

Value

£52,772

Classifications

  • Environmental services

Tags

  • award

Submission Deadline

1 year ago

Published

4 months ago

Description

The objective of this project is to increase water levels downstream of Stoke Lock to improve fish passage through the hatches.
The site is Stoke Lock, Bishopstoke Road, SO50 6AD (NGR SU4640419353). The structure is a 3rd party asset but is operated and maintained by the Environment Agency.
Stoke Lock (also known as Bishopstoke Lock) is an historic structure on the River Itchen in Eastleigh, Hampshire (GB107042022580). It is situated in a very public area adjacent to popular sports fields with a public right of way running alongside it.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Investigation of regulated tidal exchange and water level control structures for management of saline lagoons at North Killingholme Haven Pits Site of Special Scientific Interest, North East Lincolnshire

North Killingholme Haven Pits SSSI is near Immingham, North East Lincolnshire, on the south bank of the Humber Estuary (central grid reference TA1662919816). The privately owned,16ha, site comprises former clay pits which have developed into saline lagoons. It is within the Humber Estuary Special Protection Area/Ramsar site and is of international importance for non-breeding waterfowl. The site is connected to the Humber Estuary by a manually operated sluice in the flood bank, which allows for the regulated exchange of tidal water. The sluice is over 50 years old and is not fully functioning due to siltation, and health and safety concerns regarding its operation. The aims of the investigation are to survey the existing water level control structures on site, and appraise the options for management of water levels to achieve the site objectives. Outputs include a levels survey, concept designs and estimated costs for each option and associated actions. Site surveys are required. Technical and practical expertise is required. This is difficult terrain due to tidal mudflats and open water. There is also a working railway line. A site-based risk assessment will be required to be submitted to Natural England. Contract to start 1 September 2025, with final report to be submitted by 1 March 2026.

Katy Reed

Published 12 hours ago
Open

Investigation of regulated tidal exchange and water level control structures for management of saline lagoons at North Killingholme Haven Pits Site of Special Scientific Interest, North East Lincolnshire

North Killingholme Haven Pits SSSI is near Immingham, North East Lincolnshire, on the south bank of the Humber Estuary (central grid reference TA1662919816). The privately owned,16ha, site comprises former clay pits which have developed into saline lagoons. It is within the Humber Estuary Special Protection Area/Ramsar site and is of international importance for non-breeding waterfowl. The site is connected to the Humber Estuary by a manually operated sluice in the flood bank, which allows for the regulated exchange of tidal water. The sluice is over 50 years old and is not fully functioning due to siltation, and health and safety concerns regarding its operation. The aims of the investigation are to survey the existing water level control structures on site, and appraise the options for management of water levels to achieve the site objectives. Outputs include a levels survey, concept designs and estimated costs for each option and associated actions. Site surveys are required. Technical and practical expertise is required. This is difficult terrain due to tidal mudflats and open water. There is also a working railway line. A site-based risk assessment will be required to be submitted to Natural England. Contract to start 1 September 2025, with final report to be submitted by 1 March 2026.

Katy Reed

Published 5 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete