Port Ellen Terminal Development SXL0820 Mini Comp - Commercial Cost Advisor & NEC4 Project Manager

Award

Value

£498,225

Suppliers

Classifications

  • Civil engineering consultancy services
  • Public utilities
  • Architectural, construction, engineering and inspection services

Tags

  • award
  • contract

Published

1 day ago

Description

CMAL wish to appoint a sole supplier in respect of a Commercial Cost Advisor (Phase 1) providing support and an NEC4 Contract Project Manager roles (Phase 2 - subject to funding) for the Port Ellen Terminal Development (PETD) project.  The mini competition is from the Scotland Excel Framework Agreement Ref 0820 for Technical Consultancy.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Mersey Tidal Power Project - Front-End Engineering Design Services (FEED Services) - Phase 4

Liverpool City Region Combined Authority (LCRCA) is looking to progress a Front-End Engineering Design Services (FEED Services) Contract to further develop the Mersey Tidal Power Project (Project). The Specification details the scope of the FEED Services, across a combination of project, commercial and technical aspects to enable a full technoeconomic development study of all aspects of the Project. The FEED Services contract is to be performed as part of the Phase 4a Development activity on the Project, and in parallel with the Development Consent Order (DCO) Consenting activity, (performed by others) The FEED Services contract will improve the specification of the scope of works through multi-discipline outline design and deliver a comprehensive approach to future contracting of the detail engineering and construction including a full cost estimate and schedule based on the configuration, scope, method and approach to Phase 5 Engineering and Phases 6-9 Construction, Testing and Commissioning. The Specification is to be read in conjunction with other documents identified in the Tender Return. It is important that the Tenderer (Consultant) recognises the breadth and depth of activity within the FEED Services Contract scope and is able to evidence that the extent of work is within their competence and capability. Additional information: This procurement exercise is being conduct using the on line portal, The Chest, www.the-chest.org where all tender documentation can be located, any questions to be raised, and final tender submissions should all be done so through The Chest.

Open

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete