Design, install, operate and maintain Solar PV Canopy & EV Infrastructure - Concession

Open

Value

£5,207,990

Classifications

  • Installation services of electrical and mechanical equipment
  • Solar energy
  • Chargers
  • Car park control equipment
  • Site preparation work
  • Car park building construction work
  • Engineering works and construction works
  • Structural steel erection work
  • Structural steel erection work for structures
  • Electrical installation work
  • Civic-amenity services

Tags

  • tender

Submission Deadline

1 week from now

Published

1 month ago

Description

The Council is looking to appoint a concessionaire to design, install, maintain, operate and manage a Solar PV canopy and EV Charging infrastructure at Drummond Street car park with local connection infrastructure assets and possible battery storage (subject to design and consumption studies). 
The Council is seeking proposals for  a  minimum inventory of EV charging infrastructure consisting of:
20 Bays Fast 7kW plus a further 20 bays pre-provisioned with ducting for expansion;
4 bays Rapid 50kW DC; and
4 bays Ultra-rapid 200kW DC.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

BC5457 - Tir-y-Berth Primary School - LED Lighting

You are invited to submit a tender for the installation of LED lighting and associated works at Tir Y Berth Primary School, New Road, Hengoed CF82 8AU. The scope of the project is fully described in Tender Documentation but in summary the scope is: - The Electrical Services Installer shall allow for the safe isolation, removal and disposal of existing lighting as per the associated drawings. This forms part of Caerphilly CBC LAEF/Invest to Save Scheme. - The Electrical Services Installer shall allow for the supply and installation of new LED Light fittings and lighting as per the tender drawings. - The Electrical Services Installer shall allow for the installation of new emergency light fittings. This must include all required wiring alterations, cabling, GMS containment, key switches and sundry items. - The Electrical Services Installer shall allow for the installation of new lighting controls including all wiring alterations, cabling, GMS Containment and sundry items. They should also include for the inspecting and testing all existing lighting controls, any faults found shall be reported to the Contract Administrator. - The Inspection and Testing of all lighting circuits with results being provided to the Contract Administrator on Electrical Installation Condition Report Certificate. All emergency lighting works shall have an Emergency Lighting Certificate. - The provision of record drawings and O&M manuals. - Programme to be agreed with Contract Administrator and School

Katy Reed

Published 1 day ago
Open

Sizewell C Site Establishment - North plaza

This expression of interest (EOI) serves to inform the supply chain about the upcoming North Plaza construction works scope. Sizewell C (SZC) requires a contractor to construct the North Plaza, a vital component for improving access to the Temporary Construction Area (TCA) and supporting the delivery of the Sizewell C power station. The Entrance Plaza is located to the east of Abbey Road and comprises a network of roads and durable surfaces designed to support access to the TCA. The features of this plaza will include;    - An external bus interchange, providing efficient connectivity for regional transportation.   - An internal bus interchange, optimising the flow of buses servicing the site.  - A dedicated Bus parking area, providing storage for site transport when not in service.   - A car park to accommodate the vehicles of both visitors and staff.  - A designated parking area for Heavy Goods Vehicles (HGVs), providing short-term storage for heavy material deliveries.   - Security access tracks that facilitate safe movement for personnel and maintain site security.  - Footways and crossings that promote safe, non-motorized movement throughout the facility.  The scope of work for the area includes all activities necessary to complete the following: site preparation, material deliveries, duct installation routes, the creation of hard surfaces required for the described functions, and the required illumination of the area.  The following items are excluded from this scope of work:  - HXX Pass Office  - HAF Search Facility  - HUG-1 Security Lane Cabins  - HEA & HTR - Old Abbey Substation  - HOM-2 - TCA West Potable Water Storage Facility  - HUF-1 - Freight Security Building  - HAY-2 - TCA Telecoms Bunker  Tenderers will be required to: • Provide a programme of works matching or improving the suggested Phasing Plan. • To construct the plaza in its entirety, compliant and fit for purpose. • Support the Project in SZC ESG and Social Value Goals

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete