QUB/2715/25 Framework for Lab Consumables and Chemicals

Complete

Value

£0

Classifications

  • Basic inorganic and organic chemicals
  • Laboratory, hygienic or pharmaceutical glassware
  • Glassware
  • Pharmaceutical glassware
  • Hygienic glassware
  • Laboratory glassware
  • Laboratory pipettes and accessories
  • Plastic products
  • Plastic caps
  • Plastic sticks
  • Medical consumables
  • Renal consumables
  • Haematological consumables
  • Disposable non-chemical medical consumables and haematological consumables
  • Dental consumables
  • Medical preparations excluding dental consumables
  • Renal dialysis consumables
  • Miscellaneous inorganic chemicals
  • Miscellaneous organic chemicals
  • Basic organic chemicals
  • Basic inorganic chemicals
  • Hydroxides as basic inorganic chemicals
  • Protective and safety clothing
  • Safety visors
  • Safety equipment
  • Safety headgear

Tags

  • tender

Submission Deadline

7 months ago

Published

8 months ago

Description

Queen’s University Belfast (Queen’s) require the Supply and Delivery of Laboratory Consumables and Chemicals. These products will be for the general University and delivery will be required at various sites throughout the campus. For more information on the University’s sites, please click on the following campus map – Campus MapQueen’s wish to establish a framework agreement which will be categorised into seven lots as detailed below:- Lot 1 General GlassLot 2 Quick Fit GlassLot 3 Lab ConsumablesLot 4 Tissue Culture / Laboratory PlasticsLot 5 Tissue Culture ConsumablesLot 6 ChemicalsLot 7 Health, Safety and HygieneIt is anticipated that a framework of Economic Operators shall be appointed under each of the above-identified lots.Economic Operators are invited to tender for one, two or all seven Lots. There are no restrictions on how many Lots an Economic Operator can apply for. Each Lot will be evaluated independently against the evaluation criteria and Queen’s reserves t

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Supply of PPE and Corporate Clothing

Tai Tarian is seeking to issue a Contract for the supply of Tai Tarian’s PPE and Corporate Clothing This tender will be split into the following two Lots: Lot 1 – Supply of PPE Lot 2 – Supply of Corporate Clothing Lots will be awarded on an individual basis, and a Tenderer can bid for either one or both Lots. Therefore, Tenderers must ensure that their submission clearly shows that they’re able to meet the requirements of each selected Lot, and not to make any statement or assumption that their bid is conditional on being awarded all, or a minimum number of Lots. Tenderers must be aware that in regards of Lot 1, requirements will include but not be limited to the following: - • An OTIF (On-Time In-Full) delivery of all goods from the Pricing Schedule within 24 hours for core products. • A delivery service direct to Tai Tarian’s head office and satellite depots for additional items. • A local same day collection service for all goods, as and when required from a recommended and agreed “solution” giving the availability to collect within 1 hour. • A local collection and/or delivery service of additional ad hoc products throughout the contract period that are not listed in the core list Pricing Schedule. • A detailed and accurate “live” reporting function, which will include but not be limited to historic purchases per employee. • PPE must comply with the relevant EN standards. • All PPE must carry UKCA or CE markings, in accordance with the PPE Regulations 2018. • Suppliers must provide Declarations of Conformity and access to technical documentation upon request. • Items stated in the Price Schedule must be priced on a like for like basis – no alternatives will be accepted at this stage. • Annual servicing of Jetstream power respirators. • Jetstream breakdown/repair/replacements would need to be completed at short notice, with the Initial survey being completed within 24 hours. Tenderers must be aware that in regards of Lot 2, requirements will include but not be limited to the following: - • An OTIF (On-Tim-In-Full) delivery of all goods from the Pricing Schedule within 4 days from order. • A delivery service direct to Tai Tarian’s head office and satellite depots for additional items if required. • A local same day collection service for all goods, as and when required from a recommended and agreed “solution” giving the availability to collect within 1 hour. • The ability to return un-used and un-worn items within 28 days without a re-stocking charge • A local collection and/or delivery service of additional ad hoc products throughout the contract period that are not listed in the core list Pricing Schedule. • A detailed and accurate “live” reporting function, which will include but not be limited to historic purchases per employee. • Items stated in the Price Schedule must be priced on a like for like basis – no alternatives will be accepted at this stage. Tenderers must be aware that all quantities provided in the Price Schedule are estimated based on current annual quantities and used for tender purposes only. The quantities and scope of requirements may change throughout the life of the Contract. Form of Contract The Form of Contract utilised for this Contract will be Tai Tarian’s Terms and Conditions for the Supply of Goods and Related Services. Price Increase Mechanism Prices submitted in Appendix 2 - Price Schedule are to be fixed for the first 12 months of the Contract until 1st February 2027 for each Lot. Subsequent price increases will then be agreed on an annual basis. Any increases shall not exceed the latest published monthly percentage change in the Consumer Prices Index (CPI) at the time of the annual price increase review. Valuation and Payment A Supplier will submit invoices for payment and payment of undisputed invoices will be made within 30 days.

Katy Reed

Published 2 days ago
Open

Update of Regulatory Impact Assessment – Workplace Recycling Laws

This procurement is taking place under WRAP's Internal Framework FRA080: Materials Systems Transformation. Phase one of the Workplace Recycling Law came into force on 6 April 2024 in Wales, with phase 2 due to come into force in April 2026. Welsh Government is now seeking to understand the impacts of adding further materials to the list of those to be presented separately for collection and recycling. Welsh Government wishes to assess the impact of the proposed phase 3 of the Regulations which includes the impact of separating plastic film and textiles. The original RIA was conducted in 2019 (commissioned by WG) and was then revised and published in 2023 in readiness for introduction of phase 1 of the Workplace Recycling Regs. A further RIA was carried out in in July 2025 for the inclusion of sWEEE (phase 2). The policy decision to add plastic film to the list of materials to be presented separately for collection and recycling was made on the basis of the 4 nations Government Response to the 2021 pEPR consultation published 26 March 2022 (EPR Consultation Government response template) and accompanying Impact Assessment which included consideration of the plastic film requirement and is available here: Impact Assessment. The successful bidder will need to carry out an RIA assessing the inclusion of plastic film and textiles. The baseline for this analysis should include phases 1 and 2 of the Workplace Recycling Regs. The Welsh Government wishes to understand the impact of each of the proposed additions (i.e. plastic film and textiles) to the specified material streams to be separately collected. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=994379821

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete