Greener Futures Partnership - Dynamic Purchasing System

Open

Value

£500,000,000

Classifications

  • Repair and maintenance services
  • Construction work
  • Energy and related services
  • Energy-management services
  • Energy-efficiency consultancy services
  • Electricity, heating, solar and nuclear energy
  • Water installations
  • Water distribution and related services
  • Consulting services for water-supply and waste consultancy
  • Sound insulation
  • Roof insulation work
  • Insulation work
  • Thermal insulation work
  • Sound insulation work
  • District heating
  • Water heaters and heating for buildings; plumbing equipment
  • Heating equipment
  • Central-heating equipment
  • Electric space-heating apparatus
  • Plumbing and heating materials
  • Heating materials
  • Central-heating radiators and boilers and parts
  • Central-heating boilers
  • District heating boiler
  • Central-heating radiators
  • Parts of central-heating boilers
  • Heating works
  • Electrical installation work of heating and other electrical building-equipment
  • Heating, ventilation and air-conditioning installation work
  • Central-heating installation work
  • Repair and maintenance services of central heating
  • Commissioning of heating installations
  • Heating-system design services
  • Glazing work
  • Windows
  • French windows
  • Installation of windows
  • Ventilation equipment
  • Cooling and ventilation equipment
  • Ventilation consultancy services
  • Ventilation installation work
  • Ventilation and air-conditioning installation work
  • Outdoor ventilation installation work
  • Inspection of ventilation system
  • Lighting systems
  • Lighting equipment and electric lamps
  • Emergency lighting equipment
  • Parts of lamps and lighting equipment
  • Solar energy
  • Wind-energy generators
  • Other sources of energy supplies and distribution
  • Repair, maintenance and associated services of vehicles and related equipment
  • Repair and maintenance services of motor vehicles and associated equipment
  • Chargers
  • Battery chargers
  • Systems and technical consultancy services
  • Battery packs
  • Exterior lights
  • Radiators and boilers
  • Radiators
  • Water boilers
  • Boiler installation work
  • Boilers
  • Heat-recovery systems
  • Heat-recovery equipment
  • Water distribution
  • Parts of central-heating radiators
  • Information technology services
  • Software package and information systems
  • Industry specific software package
  • Financial analysis and accounting software package
  • Business intelligence software package
  • Procurement software package
  • IT software package
  • Miscellaneous software package and computer systems
  • Training software package
  • Information technology requirements review services
  • Maintenance of information technology software
  • Installation services (except software)
  • IT services: consulting, software development, Internet and support
  • Software programming and consultancy services
  • Programming services of packaged software products
  • Programming services of application software
  • Industry specific software development services
  • Networking, Internet and intranet software development services
  • Document management software development services
  • Project management software development services
  • Scheduling software development services
  • Financial analysis and accounting software development services
  • Financial analysis software development services
  • Customer Relation Management software development services
  • Business intelligence software development services
  • Procurement software development services
  • IT software development services
  • Real time operating system software development services
  • Data security software development services
  • Training software development services
  • Development software development services
  • Software-related services
  • Software support services
  • Software development services
  • Software implementation services
  • Software configuration services
  • Software consultancy services
  • Training services
  • Specialist training services
  • Staff training services
  • Industrial and technical training services
  • Industrial training services
  • Technical training services
  • Management training services
  • Environmental training services
  • Construction structures and materials; auxiliary products to construction (except electric apparatus)
  • Products related to construction materials
  • Petroleum products, fuel, electricity and other sources of energy
  • Sound insulation and room acoustics consultancy services
  • Building-fabric consultancy services
  • Construction consultancy services

Tags

  • tender

Submission Deadline

5 days from now

Published

1 month ago

Description

Greener Futures Partnership (GFP) are procuring a National Dynamic Purchasing System (DPS) made up of suitably qualified Constructors, Consultants and Suppliers for the delivery of emerging Products, Services and Technology to provide practical and innovative solutions to the market in relation to Energy Efficiency, Retrofit and Decarbonisation.
This DPS will sit alongside their existing National Decarbonisation Delivery Framework managed by Pretium Frameworks Ltd.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

The provision of Mobile Plant Equipment Hire & Maintenance - Hornsey Street

The Contractor shall provide the following service to the Client for the duration of the service period: The contract term shall be for three (3) years with the option to extend for a further two (2) years. [1 x Volvo L90H] Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls. All Cabs to be fitted with Air Conditioning. Air Pre-Cleaner to deal with dusty environment. Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts. Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers. Hydraulic isolator switch to ensure complete shut down of plant in an emergency. Additional brush attachment option included required. 1 x Volvo L70 H Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls. All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment. Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts. Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers. Hydraulic isolator switch to ensure complete shut down of plant in an emergency. 1 x JCB 3CX/JCB 4CX/JCB 5CX Amber warning beacon, audible reversing warning and standard reversing lights. Front mounted bucket - 1 piece 50mm wear edge Front solid tyres Fire Suppression System Plant Tracking System Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Isolator or emergency stop switch to ensure complete shut down of plant in an emergency. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment. Reversing Camera Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. All Cabs to be fitted with Air Conditioning. Rear Selector Grab Attachment required for sorting recyclable materials such as metal, wood, mattresses. The Collection Point/Affected Property/Treatment Site The Affected Property operates 7 x days a week. Operating hours are: Mon 07:00am-00:00 Tues-Sat 07:00am-23:30 Sunday 08:00am-17:00 Closed only Christmas Day & New Years Day Frequency of Collection/Service/Testing The Contractor shall provide a fully inclusive repairs and maintenance package within the base price to include collection charges and costs. The Contractor shall guarantee that in the event of plant and equipment failure not caused by the Operator or their agents or in excess of 24 hours, the Contractor shall undertake to supply an equivalent plant at their own cost. In the event that the Contractor is not able to supply a replacement within the agreed timeframe the Company may seek to replace with another hired plant. The contractor shall reimburse the Company the full cost of replacement and shall include any transportation costs incurred as a result of this. All plant and equipment shall hold a minimum of 12-month warranty. The Contractor is to ensure that in the event of any breakdowns (within the company's operating hours) a qualified engineer shall be sent out to site to rectify within 2 hours from notification, to investigate and or remedy the fault and or supply replacement plant. All parts failing due to general and expected wear and tear are to be replaced the Contractor at their cost. The Contractor will produce a list of parts and components which will fall within this category and are exempt within 1 month of the contract commencing. All servicing is to be carried out in accordance with manufacturer's guidance and to the manufacturer's minimum recommended specifications. Copies of all service records and annual inspections will be supplied to the company within 7 working days of all works being completed and retained by the Contractor for a period of 3 years from the expiry of agreement. Upon completion of any and all servicing, maintenance and or repair works the Contractors engineer must supply a signed handover document which states what work has been undertaken and that the plant is now safe, fit for use, fully serviceable and meets all Health & Safety requirements e.g. LOLER or PUWER certification has been issued. Costs for all part, labour and travel through wear and tear are to be included. Solid tyres are to be supplied to begin with as a one of and thereafter will be replaced/repaired by the Company.

Katy Reed

Published 44 minutes ago
Open

Cycle Parking Improvements at Queen Anne Terrace Car Park, Cambridge

Cambridge City Council (CCC) is enhancing the public cycle parking at the Queen Anne Terrace (QAT) multi-story car park on Gonville Place in central Cambridge. The cycle parking at QAT addresses a strong local need due to its proximity to key facilities, including businesses, leisure and shopping areas, hospitality venues, green open spaces, and other amenities. Recreational and sports facilities are also available on site. The proposed improvements include additional cycle parking spaces and enhancements to safety, security, and accessibility. There are two cycle parking areas at QAT: one inside the car park building and the other outside, which is not covered. Both are at street level. There is a demand for safe, secure, and accessible short-term and long-term cycle parking. In the undercover cycle parking area, CCC plans to remove all existing cycle stands and ground anchors, adjust fence lines, and screed the floor before installing new cycle stands in a 'toast-rack' setup (consisting of two or more cycle stands securely attached to horizontal steel sections), cargo cycle parking bays with new ground anchors, and signage. An access-controlled area is also proposed, which will require a swing gate fitted with mag locks. For the external cycle parking area, CCC proposes to remove all existing vegetation, including a semi-mature tree, and all existing cycle stands and concrete hardstanding. The area will then be excavated to install an engineered tree pit with a hardstanding area above, and new root-fixed cycle stands (each stand leg embedded into a concrete foundation). After re-assessing the contract's advertised value, we believe the revised range (£70k-£90k) more accurately reflects the scope of work needed for the completion of the proposed improvements

Katy Reed

Published 1 hour ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete