Wynn Brook Flap Valve

Award

Value

£57,905

Suppliers

Classifications

  • Design consultancy services

Tags

  • award

Submission Deadline

3 months ago

Published

2 months ago

Description

The flap gate at Wynn Brook, Chigwell Road, Woodford Green has been disconnected from the frame. This is affecting the operational condition of the asset. Repair works are required to bring the asset to recommended operational condition
The flap gate is still on site but not in place. In the current, damaged condition the flap gate is susceptible to back flow in high water level conditions from the River Roding.
The objective of the works is to bring the existing asset to its intended standard of service. This will be done by reinstalling the flap gate with new bracketry and security features.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Khalisah Ali

Khalisah.Ali@defra.gov.uk

0

Timeline complete

Publish
Bid
Evaluate
Award
Complete