High Risk Residential Buildings Framework (HRRB) - AWARD

Award

Description

Riverside Group (Riverside) wishes to appoint a framework of consultants who will have the experience and capability to deliver Fire consultancy services to High Risk Residential Buildings (HRRB) across the whole of England as expressed within these tender documents.  This will allow Riverside to meet its compliance responsibilities in accordance with fire safety.  The specification outlines the requirement for all services required under the framework.  
      
      The framework will include the below workstreams:  
      
      Lot /Approx Budget pa 
      
      1) Measured surveys £52k 
      2) Fire Engineer £500k 
      3) Structural Surveys £200k 
      4) Remedial Logging £TBC 
      5) FRA £200k 
      
      All works will be required on a National basis however 90% of TRGs HRRBs are in London. 
      
      TRGs high rise blocks are located across the below regions:  
      
      Liverpool 4  
      Manchester 2  
      London 90   
      Ramsgate 1  
      Birmingham 1  
      Leicester 1  
      Workington 1  
      
      We will appoint the top scoring 3 suppliers per lot to the framework.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Compartmentation Surveys & Works and General Fire Safety Rectification Work Framework for Karbon Homes

Karbon Homes require experienced and competent Contractors to deliver Compartmentation Surveys & Works and General Fire Safety Rectification Work. Lot 1 Compartmentation Surveys, Karbon Homes Operational areas 1-8 Karbon wish to appoint designated compartmentation survey providers to deliver surveys of Karbon Homes' properties. Karbon require an electronic survey report for each survey following the standard format and contents to be agreed at prestart meeting but should include as a minimum provision of colour report photographs, reference floor plans and an unpriced Compartmentation Survey Schedule. Lot 2 Compartmentation Works, Karbon Homes Operational areas 1-8 Karbon wish to appoint a framework of fire compartmentation contractors to facilitate remedial works identified from previous compartmentation surveys carried out by a third party. Also, to facilitate remedial works highlighted from fire risk assessments, general maintenance, servicing and future compartmentation surveys. Lot 3 General Fire Safety Rectification Works, Karbon Homes Areas 1-8 Karbon wish to appoint a framework of contractors for General Fire Safety Rectification Works. Within these lots all appointed contractors will be expected to act as Principal (and Main) Contractor and appoint any of Karbon Homes incumbent specialist sub-contractors, where specified to include but not be limited to the following specialisms: • Fire Alarm Systems • Access Control Systems • Dispersed Alarm / Telecare Systems • Asbestos Removal Lot 4 Compartmentation Surveys, 54 North Operational areas 9 & 10 Karbon wish to appoint designated compartmentation survey providers to deliver surveys of 54 North properties. Karbon require an electronic survey report for each survey following the standard format and contents to be agreed at prestart meeting but should include as a minimum provision of colour report photographs, reference floor plans and an unpriced Compartmentation Survey Schedule. Lot 5 Compartmentation Works, 54 North Operational areas 9 & 10 Karbon wish to appoint a framework of fire compartmentation contractors to facilitate remedial works to 54 North properties identified from previous compartmentation surveys carried out by a third party. Also, to facilitate remedial works highlighted from fire risk assessments, general maintenance, servicing and future compartmentation surveys. Lot 6 General Fire Safety Rectification Works, 54 North Operational areas 9 & 10 Karbon wish to appoint a framework of contractors for General Fire Safety Rectification Works to 54 North properties. Within these lots all appointed contractors will be expected to act as Principal (and Main) Contractor and appoint any of Karbon Homes incumbent specialist sub-contractors, where specified to include but not be limited to the following specialisms: • Fire Alarm Systems • Access Control Systems • Dispersed Alarm / Telecare Systems • Asbestos Removal As this is a Framework renewal, we are confident with our understanding of our requirements and in our understanding of the market. Therefore, no premarket engagement was undertaken for this Contract.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete