PLACE598ET Shipley Lake Design and Build Scour Pipe Installation

Award

Value

£500,000

Suppliers

Classifications

  • Construction work

Tags

  • award

Submission Deadline

6 months ago

Published

1 week ago

Description

The detailed design and build of a scour pipe facility at Shipley Lake, near Heanor. The scour will allow water levels to be lowered to facilitate maintenance and reduce the risk of flooding/failure of the dam in the future. These works are to comply with a statutory direction to implement a Measure in the Interest of Safety (MIOS) under the Reservoirs Act 1975.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete