LB Hillingdon- Bridgwater Open Space- River Enhancement Scheme

Award

Value

£44,144

Classifications

  • River regulation and flood control works

Tags

  • award

Submission Deadline

7 months ago

Published

3 months ago

Description

London Borough of Hillingdon and the Zoological Society of London are working together to develop a river enhancement project to improve the section oftheYeading Brook West that flows through Spider Park (Bridgwater Open Space)
Therefore, the London Borough of Hillingdon invited tenders from suitably qualified and experienced contractors to deliver the river enhancement project. Yeading Brook has unnaturally steep banks with little habitat diversity. The aims of river enhancement project where to;
- Reprofile / recontour riverbanks to create key habitats and improve the diversity the environment and its species;
- Contribute to reducing the peak levels and in turn, reduce the flood risk to local residents;
- Increase the ability ofthe riverto adapt and cope with the likely impact of increased intense storms resulting from climate change;
- provide more space for water and slow the flow of wate rto the Yeading Brook further helping to protect people, species and habitats by making them less vulnerable to the effects of climate change
- Create a tranquil spot for observing nature, such as dragonflies, butterflies birds and amphibians, attracted to these new and enhanced habitats.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 1 week ago
Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete