Planned Preventative Maintenance for Refrigeration, Air Conditioning and Air Handing Units, including Chillers and Drug Fridges

Award

Value

£94,870

Classifications

  • Repair and maintenance services of cooler groups
  • Air-conditioning appliances
  • Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery
  • Repair and maintenance services of electrical and mechanical building installations

Tags

  • award
  • contract

Published

4 months ago

Description

North Cumbria Integrated Care NHS Foundation Trust is seeking a pre-planned contract to ensure their equipment is kept in a safe and reliable working order and operating with optimum efficiency. A full maintenance service and repair contract to include labour and travel costs for all repairs is required. Parts will be chargeable. Labour and travel costs may be charged if no fault is found following inspection/repair, which will be scored as part of the tender evaluation (details of how this will be evaluated is in the Tender Information Document).  Ad-hoc work is not guaranteed business and the Client reserves the right to instruct alternative companies to carry out ad-hoc work if necessary. It is important to note the wide geographical area covered under the contract, which includes the whole of Cumbria. Emergency call outs and SLAs must be adhered to at all times and for all sites regardless of the location.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Minor Works Framework 2026-2030

The Minor Works Framework (MWF) was first procured in 2017 as two separate frameworks, one for Building Fabric and the other for Mechanical and Electrical services, to provide compliant procurement routes for the Hampshire County Council's Property Services team for lower value or specialist, building fabric and mechanical & electrical works. The current framework, procured in 2021, combined the two frameworks into a single framework with seven lots, and introduced a process of direct award on rotation to create efficiencies in procuring low value works and has provided more distribution of works across our supply chain. As the Council has an ongoing requirement for Minor Works, the intention is to build on the success of the current framework and having taken into account any lessons learned from the current arrangement, to develop the replacement Minor Works Framework 2026-2030. The maximum number of Suppliers that will be included in each lot is listed above in paragraph 1.2 to 1.8 and below in 18.2. Where the authority is unable to achieve the specified number of Suppliers for a lot, either through lack of returns or returns failing to meet the Authorities minimum requirements, that lot will be established with fewer than the intended maximum number. Suppliers may apply for one lot or up to a maximum of two lots. However, Suppliers who wish to apply for two lots can only apply for any one of the lots from Lot 1 to Lot 5 plus either Lot 6 or Lot 7. Alternatively, Suppliers can apply for Lot 6 and Lot 7. The process for awarding works through this framework will vary depending on the Lot as well as the contracting authority’s internal governance process, however there are two main principles of appointing Suppliers through the framework: Mini Competition - For projects where the estimated value is between the lot values, all the Suppliers on a Lot will be invited to confirm, by way of an expression of interest (EOI) based on basic project information. The EOI will accept responses for 5 working days, after which the EOI period will close and the Mini-Competition will be issued to interested Suppliers. Failure to respond to an EOI issued in the timeframe, will be considered that a Supplier is un-interested and the mini competition will only be issued to those Suppliers who submitted an EOI. Award without further competition (Direct Award) – For projects where the estimated value is between the lot values, the works can be awarded without further competition on a rotational system. The rotational list is prepared based on ranking of bidders from the framework procurement, starting from highest to lowest ranked bids in each lot. The Framework Agreement is available to all Public Sector organisations and Registered Charities within Hampshire, Isle of Wight and the surrounding Counties. This includes but is not limited to: Unitary Authorities, District, Borough, Town and Parish Councils, Fire and Police Authorities and successor counties/authorities, Local Education Schools, National Park Authorities, the NHS, Faith establishments, Universities, Colleges, Academies, ‘Free’ and maintained schools. Contracting Authorities may enter into underlying Contracts with the contractor(s) during the term of the Framework Agreement by following the Call-off Procedure as detailed in the Framework Guidelines and Working Practices. The Contracting Authorities can call-off from multiple lots should they wish to once they have signed the access agreements with HCC.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete