Value

£968,000,000

Classifications

  • Construction, foundation and surface works for highways, roads
  • Construction work for highways, roads
  • Motorway construction works
  • Road construction works
  • Main road construction works
  • Ring road construction work
  • Trunk road construction work
  • Road junction construction work
  • Grade-separated junction construction work
  • Roundabout construction work
  • Construction work for highways
  • Construction work for elevated highways
  • Highway maintenance work
  • Roadworks
  • Road-maintenance works
  • Road-repair works
  • Overpass construction work
  • Surface work for highways
  • Surface work for roads
  • Road-surface painting work
  • Paving and asphalting works
  • Carriageway resurfacing works
  • Dual carriageway construction work
  • Single carriageway construction work
  • Access road construction work
  • Slip road construction work
  • Surface coating construction work
  • Resurfacing works
  • Erection of road-barriers
  • Installation of road signs
  • Installation of safety equipment
  • Installation of road signals
  • Foundation work for highways, roads, streets and footpaths
  • Foundation work for highways
  • Engineering design services
  • Design consultancy services

Tags

  • tender

Submission Deadline

4 months ago

Published

5 months ago

Description

National Highways are proposing to put in place a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. 
The framework scope for the LCRR framework includes: 
• design and subsequent construction services for: 
   - demolition of existing concrete pavements, 
   - reconstruction of pavements (including new pavement furniture and markings)
• design and delivery of associated temporary traffic management solutions,
• when instructed: 
   - involvement in optioneering, 
   - design and construction of alterations to those legacy assets which interface with the replacement pavements’ designs, which may include sub-surface drainage,        street furniture and its foundations and signage, 
   - design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings), 

        
• performing principal designer and principal contractor duties as defined under the “Construction (Design and Management) Regulations 2015” (“CDM Regulations 2015”) 
• carbon capture recording and reporting, 
• recovery, recycling and reuse of arisings during the delivery of a scheme, 
• engagement with all identified stakeholders, and 
• identification, recording and realisation of programme efficiencies. 
The LCRR framework will be six years in duration to ensure alignment to and coverage of the RIS3 funding period (2025-30) but also to overlap with the beginning of RIS4 (2030-35) in case of any delays in approvals of the strategy or funding for RIS4. 
This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations.
From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement.
The procurement documents can be accessed via https://nationalhighways.ukp.app.jaggaer.com/esop/ogc-host/public/nationalhighways/web/login.jst?_ncp=1668156695442.1319654-1, under Invitation To Tender 878 (ITT_878).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Minor and Major Highways Works Framework

This is notification of an upcoming opportunity, in which Slough Borough Council intends to undertake a procurement exercise aimed at setting up a Framework to procure the services of contractors to undertake emergency maintenance, site investigations, minor & major highways and transport works It is anticipated that framework will comprise of 5 lots as follows ( which are subject to change before tender is issue) 1) Lot 1 - Minor Works Construction Project - value range £500,000.00 per contract 2) Lot 2 - Minor Works Construction Projects - value ranges £500,000.00 to £2,000,000.00 per contract 3) Lot 3 - Major Construction Projects - value ranges £2,000,000.00 to £10,000,000.00 per contract 4) Lot 4 - Re-active maintenance works up to the value of £100,000.00 per contract 5) Lot 5 - Carriageway Resurfacing Works up to the value of £1,000,000.00 per contract Each lot will list a number of contractors whose services are to be procured to deliver these works via mini competitions or Direct Awards, and call off contracts are to be awarded using Engineering Construction Contracts (ECC) NEC4 Option A or B Contract duration will be for a period of 3 years, with option to extend it for a further 2 year, on an annual basis of 1 + 1 Indicative Procurement Timelines are Issue of Tender Documents & Tender Notice - w/c 7 July 2025 Tender Return - End of August 2025 Tender Evaluation - September to December 2025 Internal Governance/Statutory Approvals – January/March 2026 Anticipated Contract Award Notice – April / May 2026

Katy Reed

Published 2 days ago