Oakfield Campus Youth First Building Asbestos Removal and Demolition

Award

Value

£350,000

Classifications

  • Demolition work

Tags

  • award

Submission Deadline

11 months ago

Published

9 months ago

Description

Oakfield Campus Youth First Building Asbestos Removal and Demolition\r
Swindon Borough Council invites expressions of interest from suitably qualified and experienced service providers for the asbestos removal and demolition of the Youth First Building on the former Oakfield Campus.\r
\r
Full details relating to the Works are provided in the Tender documents.\r
\r
To participate, Suppliers will need to Register as a Supplier with ProContract, www.supplyingthesouthwest.org.uk, then Register an Interest before obtaining access to the tender documents. In the event of difficulties registering as a supplier, please refer to the System Administrator Proactis support team [email protected]\r
\r
Tender clarifications to be submitted in writing via Messaging in ProContract tender portal, including the project reference and title clearly in the Subject title, by 10th December 2024, 1400 hrs UK Local time. The Council's responses to these clarification questions will be issued periodically via Messaging in ProContract tender portal. \r
\r
Tender Responses are required to be submitted no later than 13th December 2024, 1400 hrs  UK Local time via ProContract tender portal  - https://www.supplyingthesouthwest.org.uk/\r
\r
Please note that this project has been advertised on Contracts Finder/ other web portals, however, Supplying the South West Portal, https://www.supplyingthesouthwest.org.uk/ http://www.supplyingthesouthwest.org.uk/ is the only portal that includes all the relevant documents required to respond to this opportunity, bearing Project Id: DN753875\r
\r
No Tender submissions will be considered without completing the tender documents in full including attachments and returning them in alignment with the instructions within the tender documents.\r

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Removal of Existing Conservatory & Associated Works - Richmond House, Richmond Park, Gainsborough

Gainsborough Town Council invites tenders for the careful removal of an existing glazed conservatory and associated restoration works to the Grade II listed Richmond House, located within Richmond Park, Gainsborough. Works include demolition, masonry repair, joinery, sash window manufacture and installation, internal making good, decoration, and compliance with planning and heritage conditions. 1. Programme & Site Access • Contractor to supply a proposed programme of works for approval before commencement. • Access routes and site arrangements must be coordinated to avoid unnecessary disruption to site users and maintenance operations. ________________________________________ 2. Planning & Consent Conditions All works must be undertaken in accordance with the following approved drawings: • Ref: RD:5236 - 04 Rev A (June 2024) - Existing Site Plan • Ref: RD:5236 - 03 Rev C (June 2024) -Plan and Elevations • Ref: RD:5236 - 07 Rev B (June 2024) - Window Details for Reception and Office. • Ref: RD:5236 - 08 Rev B (June 2024) - Site Plan (Extension & Window Details Only). Condition 3 - Masonry Samples • No new masonry to be installed until brick and stone samples have been submitted to and approved by the Local Planning Authority (LPA). • Samples to include a test panel of brickwork (type, bond, mortar, finish) and proposed sills and heads. Condition 4 - Window & Joinery Drawings • Prior to installation, 1:20 scale drawings to be submitted for approval, showing materials, finishes, protective coatings, cross-sections, glazing details, and colour proposals. Condition 5 - Brickwork Cleaning • Method Statement to be submitted for approval before commencement of any brick cleaning, in compliance with BS 8221-1:2012. • Works must strictly follow the approved methodology. ________________________________________ 3. Description of Works 3.1 Demolition of Existing Extension • Carefully dismantle the glazed extension to prevent damage to the main structure and surrounding site. • All arising debris to be cleared and disposed of in accordance with regulations. 3.2 Removal of Base and Floor Construction • Break out the existing slab and base down to the level of adjoining paving. • Dispose of waste safely and responsibly. 3.3 External Wall Alterations • Remove render, plaster, and paint to walls affected by removal of structure. • Repoint brickwork with lime-based mortar. • Rebuild external wall sections as required, forming new window openings with matching lintels and sills. 3.4 Timber Sash Windows • Manufacture and install two new hardwood sliding sash windows to replicate the original appearance. • Include sash weights, ironmongery, and detailing in line with existing style. • All units to comply with approved drawings. 3.5 Internal Making Good • Repair disturbed walls, ceilings, and joinery to match existing finishes. • Apply lime plaster to walls and ceilings. • Use joinery-grade softwood for replacement or repairs. 3.6 Decoration & Finishes • Prepare and paint all new plasterwork and joinery. • Paint sash windows internally and externally. • Decorate affected doors and frames, with colour schemes approved in advance. 3.7 Site Management & Documentation • Provide temporary site facilities, security, and welfare as necessary. • Submit RAMS, Construction Phase Plan, and maintain a Health & Safety File in compliance with CDM. ________________________________________ 4. Quality & Standards • All works to be executed to a high standard of craftsmanship. • All materials must be new, high quality, and consistent with the historic character. • Works must comply with: o National heritage and listed building policies. o Relevant British Standards and current Building Regulations. o Health & Safety legislation. ________________________________________ 5. Completion & Handover • At practical completion, provide warranties, certification, and maintenance instructions. • Leave the site tidy and free from construction waste.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete