Blackburn birthing centre - Velux Window Replacement & Medical Gas Sore Repairs

Award

Value

£37,464

Classifications

  • Installation of windows

Tags

  • award

Submission Deadline

10 months ago

Published

9 months ago

Description

Blackburn birthing centre - Velux Window Replacement & Medical Gas Sore Repairs

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

External & Communal Pre Construction Services and Works to Houses Framework  CRN00039877

External & Communal Pre Construction Services and Works to Houses Framework Multiple Supplier Framework (of up to three contractors per Lot) to undertake various services and works related to improvement and planned maintenance works, by means of Pre-construction Services Call-offs and Works Call-offs. This Framework is to be split into 3no Lots as follows: LOT 1, Pre-Construction Services and External works, to low rise properties LOT 2, Pre-Construction Services and External works, to high rise properties LOT 3, Pre-Construction Services and Communal works, to low rise and high rise properties The following descriptions are indicative of the types of services and works that may be commissioned under each Lot. In addition, other similar services and works may also be commissioned. Bidders should note that the estimated value below consists of the provisional budget allocated within the capital plan for all contractors. The actual value per contractor will be expected to be a much smaller proportion following distribution of work amongst an anticipated 3no framework contractors per lot. Work and budgets per contractor will also be affected by work carried out by direct in-house resources, contingency allowances, non-access to properties, efficiency savings, and subject to regular reviews and re-allocations of priorities by the Council. The non-binding target is that each framework contractor would receive approximately: Lot1 GBP2-4Million of work turnover per year; Lot2 GBP1-2Million of work turnover per year; Lot3 GBP0.3-1Million of work turnover per year; The framework contractors will also be required to perform to the council's key performance indicator targets, and community benefits expectations (described elsewhere) Types of work that may be awarded to framework contractors, but is non-binding, is detailed below: LOT 1 Pre-Construction Services and External works, to low rise properties Repairs and/or installation of: external masonry, concrete and joinery flat and pitched roof coverings, external and cavity wall insulation, and related works Door/window/screen replacements Photo voltaic panels and/or air source heat pumps Repositioning and/or replacing drainage, rainwater goods, and other services to facilitate external wall insulation/render works Utility company coordination so as to reposition and/or replace gas pipework, meters etc Any other relevant services or works LOT 2 Pre-Construction Services and External works, to high rise properties Repairs and/or installation of: external masonry, concrete and joinery flat roof coverings external and cavity wall insulation, and related works Door/window/screens Repairs and/or renewing lightning protection and roof ventilation fans Repositioning and/or replacing drainage, rainwater goods, and other services to facilitate external wall insulation/render works Any other relevant services or works LOT 3 Pre-Construction Services and Communal works, to low rise and high rise properties Repairs and/or installation of: Communal door/window/screens Foyer/communal hall/stair upgrading Firestopping, smoke control ventilation Below and above ground drainage lightning protection and mechanical ventilation door entry systems and communal lighting electrical switchgear, distribution and containment fire/smoke detection fire alarms fire suppression systems Communal potable water tank replacements Communal space heating replacements Communal hot & cold water services replacements Automatic Controls for communal mechanical and electrical services Fire Panel Controls for communal fire protection Lift replacements Any other relevant services or works

Open

Removal of Existing Conservatory & Associated Works - Richmond House, Richmond Park, Gainsborough

Gainsborough Town Council invites tenders for the careful removal of an existing glazed conservatory and associated restoration works to the Grade II listed Richmond House, located within Richmond Park, Gainsborough. Works include demolition, masonry repair, joinery, sash window manufacture and installation, internal making good, decoration, and compliance with planning and heritage conditions. 1. Programme & Site Access • Contractor to supply a proposed programme of works for approval before commencement. • Access routes and site arrangements must be coordinated to avoid unnecessary disruption to site users and maintenance operations. ________________________________________ 2. Planning & Consent Conditions All works must be undertaken in accordance with the following approved drawings: • Ref: RD:5236 - 04 Rev A (June 2024) - Existing Site Plan • Ref: RD:5236 - 03 Rev C (June 2024) -Plan and Elevations • Ref: RD:5236 - 07 Rev B (June 2024) - Window Details for Reception and Office. • Ref: RD:5236 - 08 Rev B (June 2024) - Site Plan (Extension & Window Details Only). Condition 3 - Masonry Samples • No new masonry to be installed until brick and stone samples have been submitted to and approved by the Local Planning Authority (LPA). • Samples to include a test panel of brickwork (type, bond, mortar, finish) and proposed sills and heads. Condition 4 - Window & Joinery Drawings • Prior to installation, 1:20 scale drawings to be submitted for approval, showing materials, finishes, protective coatings, cross-sections, glazing details, and colour proposals. Condition 5 - Brickwork Cleaning • Method Statement to be submitted for approval before commencement of any brick cleaning, in compliance with BS 8221-1:2012. • Works must strictly follow the approved methodology. ________________________________________ 3. Description of Works 3.1 Demolition of Existing Extension • Carefully dismantle the glazed extension to prevent damage to the main structure and surrounding site. • All arising debris to be cleared and disposed of in accordance with regulations. 3.2 Removal of Base and Floor Construction • Break out the existing slab and base down to the level of adjoining paving. • Dispose of waste safely and responsibly. 3.3 External Wall Alterations • Remove render, plaster, and paint to walls affected by removal of structure. • Repoint brickwork with lime-based mortar. • Rebuild external wall sections as required, forming new window openings with matching lintels and sills. 3.4 Timber Sash Windows • Manufacture and install two new hardwood sliding sash windows to replicate the original appearance. • Include sash weights, ironmongery, and detailing in line with existing style. • All units to comply with approved drawings. 3.5 Internal Making Good • Repair disturbed walls, ceilings, and joinery to match existing finishes. • Apply lime plaster to walls and ceilings. • Use joinery-grade softwood for replacement or repairs. 3.6 Decoration & Finishes • Prepare and paint all new plasterwork and joinery. • Paint sash windows internally and externally. • Decorate affected doors and frames, with colour schemes approved in advance. 3.7 Site Management & Documentation • Provide temporary site facilities, security, and welfare as necessary. • Submit RAMS, Construction Phase Plan, and maintain a Health & Safety File in compliance with CDM. ________________________________________ 4. Quality & Standards • All works to be executed to a high standard of craftsmanship. • All materials must be new, high quality, and consistent with the historic character. • Works must comply with: o National heritage and listed building policies. o Relevant British Standards and current Building Regulations. o Health & Safety legislation. ________________________________________ 5. Completion & Handover • At practical completion, provide warranties, certification, and maintenance instructions. • Leave the site tidy and free from construction waste.

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete