Moisture-related Risks of Insulated Lime Finishes - Literature Review and Gap Analysis - AWARD

Award

Value

£0

Classifications

  • Research services

Tags

  • award

Submission Deadline

2 months ago

Published

1 month ago

Description

Historic England is an executive non-departmental public body sponsored by the Department for Culture, Media and Sport. We are the Government's advisor on the historic environment. Our purpose is to improve people's lives by championing and protecting the historic environment. Through our work, collaboration, creativity and expertise we want everyone to be able to connect with and learn from our heritage.
      Climate change is one of the most challenging issues of our time, with potential negative consequences for both people and heritage.  This project will assist Historic England showing how heritage can play an important role in improving energy efficiency through mitigation measures. This project will assist Historic England in planning future activity around commitments within our Corporate Plan and the Government's third National Adaptation Programme.  
      The Historic Building Climate Change Adaptation Team initiated a research programme on Insulated Lime Finishes in 2022. The overall programme seeks to understand the performance of insulated lime finishes (plasters and renders) both in terms of moisture transport and heat transfer. It also seeks to ascertain whether they are an appropriate energy efficiency measure for use on buildings of traditional construction from a material compatibility point of view. Their potential impact on the heritage significance of the building are outside of the scope of the overarching research programme.
      The research programme was structured in different phases from its inception, looking at short, medium- and long-term studies. Two phases have already been completed (see section 3. Background).
      The current research proposal builds on the findings of those previous phases, but focusses on understanding whether research has been undertaken looking at moisture-related risks of insulated lime finishes (i.e. moisture accumulation and/or drying capacity reduction), and how such risks can potentially increase rather than reduce the thermal conductivity of the envelope and/or accelerate the degradation / reduce the longevity of the insulated lime finish.
      
      
      The Literature Review and Gap Analysis produced with this research project will:
      o Produce a spreadsheet (or similar formatted document) collating information from research papers on mixing components as well as mixing methods, substrates, hygrothermal properties of the mixes and moisture-related risks identified.
      o Produce a report in Historic England's format for publication in our Research Report Series. The document will include an Executive Summary and all assimilated information appended and conclude with a succinct summary of identified critical 'next steps' (e.g. further literature review, case study(ies) and/or research to address aforementioned knowledge gaps).
      o Deliver results to the Historic England team and, on agreement, co-host a Technical Tuesday webinar.
      o Highlight future research needs, particularly if feeding in...

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

PS25001 - Scientific Research and Advice for Government Dynamic Purchasing System - DPS Application

The final date and time for initial DPS Applications is Monday 31st March 2025 at 11:00 am DO NOT apply directly to the buyer. All tender information MUST be submitted through the Jaggaer eSourcing Portal. Brief Description of Requirement UKSBS (Central Purchasing Body) on behalf of the Department for Science, Innovation & Technology (DSIT) (the Contracting Authority) wishes to establish a Dynamic Purchasing System (DPS) for the provision of Scientific research & advice for Government. UKSBS is managing this procurement process in accordance with the Public Contracts Regulations 2015 (as may be amended from time to time) (the "Regulations") This is a Services Dynamic Purchasing System (DPS). The Dynamic Purchasing System (DPS) shall be in operation until either the DPS exceeds its advertised value or an end date of 23rd February 2029, whichever occurs first. You can apply to join the DPS at any point and don't require any special IT equipment as a DPS eliminates unnecessary activity for you upfront. Full details of the DPS scope and Application information can be found within the notice attachments and within the attachment tab on the Jaggaer eSourcing portal How to Apply UK Shared Business Services Ltd (UK SBS) will be using the Jaggaer eSourcing Portal for this procurement. To register on the Jaggaer eSourcing portal please use the link https://beisgroup.ukp.app.jaggaer.com/ and follow the instructions to register as a supplier. If you are already registered on the Jaggaer eSourcing Portal and wish to participate in this procurement, please use the link: https://beisgroup.ukp.app.jaggaer.com/. Once you are logged into the system you will be able to locate the Procurement you wish to leave a bid on by clicking the PQQs Open to All Suppliers and searching for the reference number PQQ82.

Open

Technical Preparedness Study - Hydrogen Blends in the Northern Ireland Gas Distribution Networks

The Northern Ireland Gas Distribution Network Operators (DNOs) (i.e. firmus energy (Distribution) Limited (firmus energy networks), Phoenix Energy Group Limited and SGN Evolve Network Limited), along with Transmission System Operators - Mutual Energy and Gas Networks Ireland (UK) - have established a pathway to decarbonise the NI Gas Network by 2050. To support this pathway, we have developed an extensive programme of research projects to support our preparations to accommodate large volumes of renewable gas. The objective of this project is to establish the readiness of NI's gas distribution networks to accept hydrogen and natural gas blends including assessment of pressure reduction stations, primary meter installations and the impacts on larger end user downstream systems. The project will aim at the outset, to maximise the draw down of relevant evidence and data from publicly available hydrogen related trials, testing and research work and other industry sources thus enabling focus to be placed on identifying and addressing gaps in data, equipment performance verification and materials testing that are specific to the NI gas distribution networks. The NI DNOs are therefore seeking a qualified and suitably experienced consultant to establish the technical and safety readiness of the NI distribution networks and end user downstream systems to accept hydrogen. Whilst the immediate priority is to identify the limits of existing gas infrastructure and end user downstream systems for hydrogen blends of up to 20% by volume, this project work shall not preclude consideration of 100% hydrogen where this can be practically, and cost effectively covered in assessments and investigative works. The final outcome of this project is expected to be a detailed and comprehensive report on the current hydrogen ready status of NI gas networks and metering assets that identifies and quantifies safety risks and mitigations, with a prioritised and cost estimated roadmap outlining the requirements for network modification or replacement, recommended areas of further testing/research work and associated expenditure, as necessary, to safely facilitate injected hydrogen.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete