Brighter Places - Gas and Electric Servicing, Breakdown and Compliance Contracts

Award

Value

£7,462,737

Classifications

  • Repair and maintenance services of central heating
  • District heating
  • District heating boiler
  • Central-heating radiators
  • Non-electrically-heated central-heating radiators
  • Central-heating boilers
  • Heating works
  • District-heating plant construction work
  • Heating plant construction work
  • Heating-plant repair and maintenance work
  • Heating, ventilation and air-conditioning installation work
  • Central-heating installation work
  • Commissioning of heating installations
  • Heating equipment
  • Central-heating equipment
  • Domestic cooking or heating equipment
  • Central-heating radiator valves
  • Plumbing and heating materials
  • Heating materials
  • Parts of central-heating boilers
  • Electrical installation work of heating and other electrical building-equipment
  • Mechanical installations
  • Repair and maintenance services of electrical and mechanical building installations
  • Asbestos-removal work
  • Asbestos removal services
  • Call centre
  • Solar energy
  • Building construction work
  • Repair and maintenance services of building installations
  • Heat pumps
  • Electricity, heating, solar and nuclear energy
  • Electrical installation work
  • Electrical wiring and fitting work
  • Electrical wiring work
  • Electrical fitting work
  • Repair and maintenance services of electrical building installations
  • Installation services of electrical and mechanical equipment
  • Installation services of electrical equipment
  • Electrical services
  • Mechanical and electrical engineering services
  • Construction work for houses
  • Environmental improvement works
  • Construction work for multi-dwelling buildings and individual houses
  • Fire-detection systems
  • Fire-alarm systems
  • Fire-alarm system installation work
  • Lightning-protection works

Tags

  • award
  • contract

Published

3 months ago

Description

Brighter Places sought expressions of interest from suitably skilled and experienced Suppliers to deliver Gas and Electric servicing and remedial works across its stock in Bristol and the surrounding areas, consisting of approximately 3,600 properties. The contract was split into two lots, with contractors able to bid for both, but only win one lot.  The Contract will be for a total of 15 years, with an initial period of 10 years, followed by a potential 5 year extension. The Contract sought to offer the benefits of best practice in contract delivery and collaborative working practices for Brighter Places. Brighter Places followed a restricted procedure, comprising of two stages: an SQ and an ITT. Following evaluation of ITT's, Brighter Places intended to award to a single contractor per lot. Full details of the requirements and instructions were included in the procurement and tender documents.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Headquarters Dog Section Refurbishment 2025

Cumbria Constabulary require a refurbishment scheme to upgrade their existing dog kennels and attached buildings at their Carleton Hall, Penrith, Headquarters site. The current unit was constructed circa 1960 and comprises office accommodation, storage rooms, kitchen, welfare and 15 no. dog kennels. There is a generous grassed area externally which is used to exercise the dogs. Within the exercise area is a timber, freestanding kennel on a concrete slab. The site is enclosed by a chain-link fence. Construction is typical of that era with concrete block external walls, suspended ceilings, solid internal walls and a concrete floor slab. The kennels have a profiled sheet roof covering believed to be asbestos with the office accommodation having a bitumen felt flat roof. Windows are timber framed. A condition survey has revealed extensive defects and issues with the building fabric. The current condition of the kennels has also raised concerns around dog welfare due to their dilapidated condition. Due to the above, an urgent refurbishment project is required to bring the kennels up to the welfare standards. A light touch refurbishment scheme to the offices will be included, but the works will predominately be around the construction of the new kennels. There is known Asbestos Containing Material within the building. An R&D survey has been carried out which is included for your reference. The Asbestos Management survey is also included. Any asbestos removal should be included as part of the works. Demolition of the existing 15 kennels to allow for the construction of 13 new kennels. The footprint of the building cannot be increased; therefore, the total number of kennels is to be reduced to increase the size of 5 kennels to accommodate the large breed dogs. A detached, double quarantine kennel is to be constructed to replace the freestanding timber kennel which currently sits on the concrete slab. Some remedial works may be required to the concrete slab. The kennels will be a basic construction comprising concrete block with composite, insulated roof panels. An internal hatch will separate the run from the sleeping area which can be closed off using a mechanical pulley operated both internally and externally. A new dog wash is to be constructed with access gained from a new corridor and door opening within the attached building. An ecology survey has identified roosting bats to the flat roof of the main building. Therefore, the flat roof is to receive ad-hoc bitumen repairs.

Katy Reed

Published 1 day ago
Open

Headquarters Dog Section Refurbishment 2025

4.1 Cumbria Constabulary require a refurbishment scheme to upgrade their existing dog kennels and attached buildings at their Carleton Hall, Penrith, Headquarters site. The current unit was constructed circa 1960 and comprises office accommodation, storage rooms, kitchen, welfare and 15 no. dog kennels. There is a generous grassed area externally which is used to exercise the dogs. Within the exercise area is a timber, freestanding kennel on a concrete slab. The site is enclosed by a chain-link fence. Construction is typical of that era with concrete block external walls, suspended ceilings, solid internal walls and a concrete floor slab. The kennels have a profiled sheet roof covering believed to be asbestos with the office accommodation having a bitumen felt flat roof. Windows are timber framed. A condition survey has revealed extensive defects and issues with the building fabric. The current condition of the kennels has also raised concerns around dog welfare due to their dilapidated condition. Due to the above, an urgent refurbishment project is required to bring the kennels up to the welfare standards. A light touch refurbishment scheme to the offices will be included, but the works will predominately be around the construction of the new kennels. There is known Asbestos Containing Material within the building. An R&D survey has been carried out which is included for your reference. The Asbestos Management survey is also included. Any asbestos removal should be included as part of the works. Demolition of the existing 15 kennels to allow for the construction of 13 new kennels. The footprint of the building cannot be increased; therefore, the total number of kennels is to be reduced to increase the size of 5 kennels to accommodate the large breed dogs. A detached, double quarantine kennel is to be constructed to replace the freestanding timber kennel which currently sits on the concrete slab. Some remedial works may be required to the concrete slab. The kennels will be a basic construction comprising concrete block with composite, insulated roof panels. An internal hatch will separate the run from the sleeping area which can be closed off using a mechanical pulley operated both internally and externally. A new dog wash is to be constructed with access gained from a new corridor and door opening within the attached building. An ecology survey has identified roosting bats to the flat roof of the main building. Therefore, the flat roof is to receive ad-hoc bitumen repairs.

Katy Reed

Published 1 day ago
Open

Headquarters Dog Section Refurbishment 2025

4.1 Cumbria Constabulary require a refurbishment scheme to upgrade their existing dog kennels and attached buildings at their Carleton Hall, Penrith, Headquarters site. The current unit was constructed circa 1960 and comprises office accommodation, storage rooms, kitchen, welfare and 15 no. dog kennels. There is a generous grassed area externally which is used to exercise the dogs. Within the exercise area is a timber, freestanding kennel on a concrete slab. The site is enclosed by a chain-link fence. Construction is typical of that era with concrete block external walls, suspended ceilings, solid internal walls and a concrete floor slab. The kennels have a profiled sheet roof covering believed to be asbestos with the office accommodation having a bitumen felt flat roof. Windows are timber framed. A condition survey has revealed extensive defects and issues with the building fabric. The current condition of the kennels has also raised concerns around dog welfare due to their dilapidated condition. Due to the above, an urgent refurbishment project is required to bring the kennels up to the welfare standards. A light touch refurbishment scheme to the offices will be included, but the works will predominately be around the construction of the new kennels. There is known Asbestos Containing Material within the building. An R&D survey has been carried out which is included for your reference. The Asbestos Management survey is also included. Any asbestos removal should be included as part of the works. Demolition of the existing 15 kennels to allow for the construction of 13 new kennels. The footprint of the building cannot be increased; therefore, the total number of kennels is to be reduced to increase the size of 5 kennels to accommodate the large breed dogs. A detached, double quarantine kennel is to be constructed to replace the freestanding timber kennel which currently sits on the concrete slab. Some remedial works may be required to the concrete slab. The kennels will be a basic construction comprising concrete block with composite, insulated roof panels. An internal hatch will separate the run from the sleeping area which can be closed off using a mechanical pulley operated both internally and externally. A new dog wash is to be constructed with access gained from a new corridor and door opening within the attached building. An ecology survey has identified roosting bats to the flat roof of the main building. Therefore, the flat roof is to receive ad-hoc bitumen repairs.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete