BATTERY ENERGY STORAGE INSTALLATION (BESS) - Multiple UK & Ireland Based

Open

Value

£10,000,000

Classifications

  • Solar energy

Tags

  • tender

Submission Deadline

5 days from now

Published

1 week ago

Description

Fluence Energy (A Siemens and AES Company) have an exciting BoP EPC project pipeline for 2025. Fluence are working with some fantastic new and existing customers, helping them to deliver comprehensive turnkey Battery Energy Storage Solutions (BESS). 
      
      We are looking to contract with Balance of Plant (BoP) Civil and Electrical contractors to deliver an initial pipeline of 3 projects. All three projects are Turnkey and located within UK & Ireland. The Specific areas of these projects are in close proximity to: East Ayrshire (Scotland), Greater Manchester (England) and Dublin (Ireland).
      
      Typical BoP scope activities includes (but not limited to):
      
      Preliminaries:
      Project & Site Management
      Design & Engineering Management
      Electrical System Studies
      Site Setup
      
      Civil Works:
      Enabling Works
      Setting out and surveys
      HSE, site infrastructure and CDM compliance
      Temporary works requirements
      Establish Finished platform 
      Piling 
      Drainage works
      Ducting and troughing installation
      Installation of equipment bases 
      Control Room Installation 
      Equipment lifting 
      Landscaping
      
      Electrical Works:
      Lightning Protection, earthing, bonding
      Supply & install of switchboards
      Supply & Install cables including terminations
      Supply & Install Auxiliar Transformers
      Supply & Install Containerised Building/Control Room/s
      Control & Protection Panels & Wiring
      Supply & Install BESS External Lighting
      Supply & Install BESS CCTV System (optional)
      Supply & Install DC Systems (Containerised Building) (Optional)
      Installation of Fire Alarm Panels (including wiring )
      BESS - Offloading, Positioning & Installation of Battery Enclosures 
      BESS - Cooling Liquid filling of Battery Enclosures 
      BESS - Offloading, Positioning & Installation of Power Conversion Systems
      BESS - Offloading, Positioning & Installation of Core Transformers 
      BESS - Offloading, Positioning & Installation of Core Support Enclosures
      BESS - Offloading, Positioning & Installation of Core Auxiliary Power Panel 
      BESS - Supply & Installation of Cables in all Battery Nodes 
      BESS - Supply & Installation of Communication Cables
      BESS - Supply & Installation of Auxiliary Power Cables
      BESS - Supply & Installation of All Cables from BESS PEC Unit to IPP Customer Control Building
      BESS - Supply & Installation of Auxiliary F-Stop Cables
      BESS - Supply & Installation of Fire Alarm System Cables
      
      Test & Commissioning:
      Test & Commissioning Containerised Building (Switchgear, LV AC & DC, Fire, C&P and FO Cables)
      Quality Assurance Documentation

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Matthew Cemm

[email protected]

7891367141

Timeline active

Publish
Bid
Evaluate
Award
Complete