Installation of new VRF system at Leigh-On-Sea Primary Care Centre

Award

Value

£189,312

Classifications

  • Cooling and ventilation equipment

Tags

  • award

Submission Deadline

8 months ago

Published

5 months ago

Description

Installation of new VRF system at Leigh-On-Sea Primary Care Centre

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

5391 - Blackwood Comprehensive School – Ventilation Works

You are invited to submit a tender for the installation of ventilation units and boxing in of heating pipes. The scope of the project is fully described in Tender Documentation but in summary the scope is: - The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period. - The contractor shall be responsible for the removal and reinstatement of any loose and fixed furniture to allow the installation of all ventilation services and equipment as shown on the drawings. - Form new openings in the existing structure to allow the installation of the new external weather louvres - Carefully take down and reinstate any false ceilings to allow the installation of the new ventilation systems. Any damaged or stained ceiling tiles shall be replaced with new to match existing. - Install all of the new ventilation equipment and ductwork as shown on the tender drawings including all necessary wiring and controls. - Employ specialist commissioning engineers to set to work all new ventilation systems in accordance with the manufacturer’s requirements and demonstrate the correct operation of all systems to the satisfaction of the contract administrator. - Supply & install ventilation units, ducting and ancillary grilles/louvres, etc - Insulate & box-in exposed heating pipework - Electrical supplies to new equipment - Controls work & commissioning - Associated Builders Work - Provide O&M manuals and provide user training - The timescale for the work is 6 weeks from commencement of the contract. - Contractors shall note that the maximum time the school can be closed for is 6 weeks and if they cannot complete the work detailed in that time then they should not submit a tender proposal. - Works to be completed by 30th August 2025 - Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the contract period.

Katy Reed

Published 3 days ago
Open

Regional Estates Solutions Framework Agreement

Purpose This is a Regional Estate Solution Framework is designed to streamline estate planning, management, and infrastructure development regional health and regional public sector organisations, including NHS Trusts, local authorities and all public sector body. It provides a structured procurement mechanism to ensure cost efficiency, sustainability, and compliance with public sector regulations. This Framework Agreement will focus on the South and South-East Region of the UK, with the aim to set up a regionalised Estates Minor Works and Maintenance solution for the Public Sector bodies within this area. Lot Structure The Regional Estate Solution Framework is divided into the following 6 key Lots. Lot 1: Consultancy Services: Lot 2: Property & Building Management Systems Lot 3: Minor Works and Maintenance Sub-lot No Sub-lot Name 3A Air Handling Units, Filters, Ventilation & Extraction 3B Asbestos Removal/Treatment 3C Boilers & Associated Plant (install & maintain) 3D Brick And Blockwork 3E Building (General) 3F Building (Hospital) 3G Building Management Systems & Automatic Control Systems 3H Cleaning and Site Clearance 3I Cooling & Refrigeration – Chillers Condensers & Split A/Cs 3J Curtain Wall 3K Demolition Work 3L Doors 3M Drainage 3N Fencing and Gates 3O Fire Protection Sprinklers + Fire Protection-Smoke Vents (Automatic)+ Fire Systems – Fire Alarm Systems, Smoke/ Heat Detection Systems, Sprinkler Systems, Extinguishers & Hose Reels (Hospital) 3P Flooring (General) 3Q Glazing 3R Joinery and Partition 3S Landscaping 3T Painting & Decorating (General) 3U Plastering 3V Plumbing 3W Road Maintenance (Minor Works) 3X Roofing 3Y Scaffolding 3Z Wall and Floor Tiling 3AA Water Systems – Servicing, Legionella Testing, Thermostatic Mixing Valves, Water Hygiene & Associated Plant 3AB Windows (PVCU) 3AC Mould & Damp Lot 4: Mechanical & Electrical Services Sub-lot No Sub-lot Name 4a Electrical Installation & Maintenance Services 4b Emergency Lighting & Power 4c Lifts, Escalators and Conveyance Systems 4d Medical Gas Pipeline & Equipment Maintenance 4e Portable Appliance Testing & Fixed Wire Testing 4f Security, Access Control, Intruder & CCTV Systems 4g UPS & Generators Lot 5: Medical & Specialist Equipment/Services Lot 6: Managed Service:

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete