Potteries Museum & Art Gallery (PMAG)- Arts Council England - Phase 1 Pre-Construction Service Agreement RIBA Stage 3 & 4

Award

Value

£4,100,000

Classifications

  • Construction work
  • Architectural, construction, engineering and inspection services
  • Construction structures and materials; auxiliary products to construction (except electric apparatus)

Tags

  • award
  • contract

Published

1 month ago

Description

Stoke-on-Trent City Council and their appointed Multi-Disciplinary Design Team are looking to procure the services of a Main Contractor via a Two-Stage Tender under a JCT Design & Build 2024 Contract. The appointed Contractor will enter a JCT PRE-CONTRACT SERVICES AGREEMENT (GENERAL CONTRACTOR) 2016 EDITION with Stoke-on-Trent City Council to assist with the development of the RIBA Stage 4 design and procurement process, within the parameters of the Arts Council England (ACE) Funding Criteria.
A client decision has been made to appoint the contractor towards the end of RIBA stage 3 to conduct a RIBA stage 3 review and engage stakeholders before moving on to RIBA stage 4.
The evaluation criteria will be split based on a 60% price and 40% quality split. This ensures that a Contractor is chosen with relevant experience of working in this sector and especially around an ongoing operation where members of the public and staff could be in close proximity to the works whilst also ensuring value for money.
The preliminary costs and overheads and profit percentage will form part of the PCSA procurement process. Following RIBA stage 4, the contractor will seek sub-contractor quotations in order to produce a contract sum. The agreed overheads and profit percentage, and preliminary costs will be fixed. Stoke-on-Trent City Council reserve the right to request the contractor to obtain sub-contractor quotations from pre-selected sub-contractors. For all works packages, the contractor must endeavour to obtain three sub-contractor quotations. These will be interrogated by the consultant to ensure value for money is achieved.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

GSMD Cyclical Works 2025 - 2030 Professional Services

The City of London Corporation (the City) invites Tenders for the provision of a Lead Consultant (Project Management, Cost Consultancy, Architectural, Building Surveyor and Building Control Principal Designer) and Mechanical, Electrical and Plumbing (MEP) Consultants as part of the design team to deliver a programme of combined minor improvements and cyclical works to refurbish the Guildhall School of Music & Drama from 2025 to 2030. The tender has been divided into two (2) lots. Lot 1 - Lead Consultant and Lot 2 - Mechanical, Electrical and Plumbing Consultants. Please note that bidders are permitted to bid for and can be awarded both lots. The duration of the contract is five (5) years. This tendering exercise is being undertaken using the electronic tendering system 'City of London Corporation Sourcing & Contracts Portal' (https://cityoflondon.ukp.app.jaggaer.com). Suppliers will need to register an interest on the system in order to participate and registration is free. Where bidders are submitting tenders for more than one lot, the combined annual value of those lots will be used for the purposes of assessing financial and economic standing. The estimated annual contract value for each lot is as follows: Lot 1 - 120000.00GBP Lot 2 - 70000.00GBP Each bidder MUST complete the qualification envelope irrespective of which lot(s) they are bidding for. Each bidder MUST also complete the relevant ITT for each lot they are bidding for.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete