DfI TRAM T-1131 A1 Junctions Phase 2 Road Improvements Scheme

Complete

Value

£78,000,000

Classifications

  • Works for complete or part construction and civil engineering work
  • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • Engineering works and construction works

Tags

  • tender

Submission Deadline

5 months ago

Published

6 months ago

Description

The works required under this contract involve the design and construction of improvement works along approximately 25.2km of the A1 dual carriageway between Loughbrickland and the Hillsborough Roundabout. This will be a Design and Build contract, and as such the applicant will be required to manage the design and the construction processes for all permanent and temporary works associated with the Contract. The proposed scheme will include, but is not limited to, the following main elements: (i) Construction of 4 Compact Grade Separated Junctions (CGSJ), (ii) Construction of a new northbound on-slip from the Castlewellan Road (Banbridge) onto the A1, (iii) Construction of a link road connecting the Milebush Road to the Hillsborough Road CGSJ, Dromore, (iv) Closure of all gaps within the central reserve, (v) Installation of a continuous rigid central reserve safety barrier the full 25.2km length of the scheme, (vi) Closure of 9 selected side roads and approximately 50 private accesses on the mainline, (vii) Conversion of 21 No. existing minor road junctions onto the A1 to Left-IN/Left-Out (LILO) configurations, (viii) Installation of Intelligent Transport Systems (ITS) including Variable Message Signs (VMS), Closed-Circuit Television (CCTV) and Automatic Number Plate Recognition (ANPR), and (ix) Accommodation works including accesses, laneways, fencing, planting, drainage, utility alterations, etc.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete