Workington Gateway

Award

Value

£3,790,000

Classifications

  • Construction work

Tags

  • award

Submission Deadline

1 year ago

Published

10 months ago

Description

The Project forms part of the wider Workington Gateway programme, which is made up of the following elements:\r
1. Ramsay Brow junction (A66/A596) improvement to improve access to strategic employment sites, including the Port of Workington.\r
2. Road widening of Hall Brow (A596) to improve access to strategic employment sites, including the Port of Workington.\r
3. Local active travel network improvements and enhanced public realm, including a new LTN1/20 compliant east-west cycle route through Hall Park running parallel and complementary to the A66, supporting proposals in the Local Cycling and Walking Infrastructure Plan (LCWIP).\r
4. Enhancement of the cultural offer and visitor experience within Hall Park, including creation of a Social Enterprise Centre within the Walled Garden, and feature lighting of Workington Hall.\r
\r
\r
This Project will generally comprise:\r
• Realignment and widening of the A66 Ramsay Brow/ A596 junction, allowing HGV movement from the A66 to the employment and distribution sites north of Workington.\r
o A pocket park to replace the existing Henry's pub site with improved public realm, seating and a landscaped area.\r
o New toucan crossings on the eastern and southern arms of the junction.\r
o New cycle infrastructure along the A596 eastern footway between the A66 and Ladies Walk.\r
o Widening of the A66 Ramsay Brow southern footway to achieve minimum 2m width throughout.\r
• Widening of the A596 Hall Brow, allowing HGV movement from the A66 to the employment and distribution sites north of Workington.\r
o Formal permit-holder only parking for the Hall Brow residents.\r
o Relocated existing park boundary wall to accommodate carriageway widening.\r
o New parallel Toucan crossing for pedestrians and cyclists across the A596, connecting Black Path to the park.\r
\r
The Project will be delivered in two stages:\r
Stage 1: Design and production of Stage 2 Works Information: Administered under NEC3 ECC Option A.\r
Stage 2: Construction: Administered under a separate NEC3 ECC Option A.\r
There will be a decision hold-point between Stage 1 and Stage 2 where the Employer may choose to proceed, or not to proceed to Stage 2.\r
\r
Suppliers wishing to express an interest and obtain access to the tender documents should go to www.the-chest.org.uk and click on current opportunities from the navigation area on the left of the screen. On the next screen enter the contract Reference DN739098  in the box labelled 'contains' then click search. Click on the Blue link for the contract title to view the opportunity. \r
To express an interest you will need to login. If you are not already registered on the www.the-chest.org.uk you will need to return to the home page and click on Register. Register free link in the navigation area on the left of the screen. Registration is free of charge and your username and password will be emailed to you.\r

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Homes England - Haul road, enabling and accommodation works at Attleborough Sustainable Urban Extension (SUE), Norfolk

Homes England requires a contractor to undertake enabling works at Attleborough Sustainable Urban Extension (SUE) in Norfolk. This contract will be an NEC4 Engineering and Construction Contract (Option A) requiring the construction of a 2.4km long haul road/maintenance track with associated surface water drainage, and other enabling works including power supply and S104 foul sewer (subject to planning) at Attleborough Sustainable Urban Extension. In brief, the scope includes: • Construction of haul road and maintenance track • Surface water drainage for haul road and maintenance track • Enabling works for proposed UKPN power supply • Cadent gas main protection • Anglian Water rising main investigation and protection • Vegetation clearance • Field access accommodation works (gates, fencing, field access points) • Archaeological monitoring • Foul sewer construction (to be confirmed – subject to planning approval and programme) Please note: - The dates stated in this notice are for the initial works and may be extended to include additional works (for example, the foul sewer). The dates for this additional work would be agreed with the successful contractor so cannot be quantified at this point. This is clearly identified in the tender documents. - The value stated in this notice is the midpoint of a range between £1,000,000 - £1,500,000 (exclusive of VAT). - The value stated in this notice is for the initial works and may be extended to include additional works (for example, the foul sewer). It is expected that the full contract value is estimated at approximately £3,000,000 (exclusive of VAT). Any additional works are clearly identified in the tender documents. A previous notice has been issued for this procurement on Contracts Finder, prior to the new Regulations. This can be found on Contracts Finder with the reference number HCA001-DN707505-51989851.

Katy Reed

Published 1 day ago