Workington Gateway

Award

Value

£3,790,000

Classifications

  • Construction work

Tags

  • award

Submission Deadline

9 months ago

Published

7 months ago

Description

The Project forms part of the wider Workington Gateway programme, which is made up of the following elements:\r
1. Ramsay Brow junction (A66/A596) improvement to improve access to strategic employment sites, including the Port of Workington.\r
2. Road widening of Hall Brow (A596) to improve access to strategic employment sites, including the Port of Workington.\r
3. Local active travel network improvements and enhanced public realm, including a new LTN1/20 compliant east-west cycle route through Hall Park running parallel and complementary to the A66, supporting proposals in the Local Cycling and Walking Infrastructure Plan (LCWIP).\r
4. Enhancement of the cultural offer and visitor experience within Hall Park, including creation of a Social Enterprise Centre within the Walled Garden, and feature lighting of Workington Hall.\r
\r
\r
This Project will generally comprise:\r
• Realignment and widening of the A66 Ramsay Brow/ A596 junction, allowing HGV movement from the A66 to the employment and distribution sites north of Workington.\r
o A pocket park to replace the existing Henry's pub site with improved public realm, seating and a landscaped area.\r
o New toucan crossings on the eastern and southern arms of the junction.\r
o New cycle infrastructure along the A596 eastern footway between the A66 and Ladies Walk.\r
o Widening of the A66 Ramsay Brow southern footway to achieve minimum 2m width throughout.\r
• Widening of the A596 Hall Brow, allowing HGV movement from the A66 to the employment and distribution sites north of Workington.\r
o Formal permit-holder only parking for the Hall Brow residents.\r
o Relocated existing park boundary wall to accommodate carriageway widening.\r
o New parallel Toucan crossing for pedestrians and cyclists across the A596, connecting Black Path to the park.\r
\r
The Project will be delivered in two stages:\r
Stage 1: Design and production of Stage 2 Works Information: Administered under NEC3 ECC Option A.\r
Stage 2: Construction: Administered under a separate NEC3 ECC Option A.\r
There will be a decision hold-point between Stage 1 and Stage 2 where the Employer may choose to proceed, or not to proceed to Stage 2.\r
\r
Suppliers wishing to express an interest and obtain access to the tender documents should go to www.the-chest.org.uk and click on current opportunities from the navigation area on the left of the screen. On the next screen enter the contract Reference DN739098  in the box labelled 'contains' then click search. Click on the Blue link for the contract title to view the opportunity. \r
To express an interest you will need to login. If you are not already registered on the www.the-chest.org.uk you will need to return to the home page and click on Register. Register free link in the navigation area on the left of the screen. Registration is free of charge and your username and password will be emailed to you.\r

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

5471 – Bedwas High School, Boiler Replacement

Caerphilly CBC are inviting contractors to submit a tender for the replacement of the main boilers serving blocks A+B at Bedwas High School, Newport Road, Bedwas, Caerphilly. The scope of the project is fully described in the ITT. In summary the scope is: The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period Carefully survey all services in the existing plant rooms and remove all redundant mechanical and electrical services including any brackets and containment and all redundant plant bases. The contractor shall form new openings in the outside wall to install new weather louvres at high and low level. The contractor shall adapt and make good the plant bases which are to be re-used. The contractor shall install and set to work all new plant and controls generally as shown on the tender drawing. All new and existing services within the boiler room are to insulated as specified. The contractor shall employ the boiler manufacturer’s commissioning engineers to commission the new boilers and certificate them. Employ specialist commissioning engineers to hydraulically balance all system and sub circuits, and demonstrate the correct operation of all systems to the satisfaction of the contract administrator. The timescale for the work is 6 weeks from commencement of the contract. Contractors shall note that the work may continue into the school term time when pupils will be on-site and must make all allowances for segregating and securing the works area. Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the 6-week period given. Full details are provided in the ITT on Proactis Plaza

Katy Reed

Published 1 hour ago
Open

Buildings Remediation Framework

The Guinness Partnership Limited, in partnership with its appointed managing agent ProcurePublic Limited, invites suitably qualified and experienced contractors to submit tenders for inclusion on a new Buildings Remediation Framework. The Framework will be structured to support both planned and reactive building remediation projects and will enable the delivery of comprehensive building remediation works across residential and mixed-use developments. This opportunity is open to all competent contractors with demonstrable experience in building remediation. Bidders may apply for one or more workstream (CPV, Region, Contract Value) depending on their capabilities. The framework will be made available for use by all UK public sector contracting authorities. ProcurePublic encourages applications from SMEs, regional contractors, tier 1 contractors and specialist providers committed to delivering quality, safety, and compliance. Organisations will be able to select the size of the project they wish to be considered for, ensuring fairness. The scope includes, but is not limited to: Fire Safety and Prevention Works, including: Removal and replacement of unsafe cladding systems Fire stopping and compartmentation Installation of fire doors and associated joinery Fire detection and suppression systems Structural Remediation, such as: Concrete and steel frame repairs Structural strengthening and stabilisation Foundation improvements Envelope and External Works, including: Façade replacement and repairs Roof and balcony refurbishment Window and door replacements Internal Building Safety Works, covering: Lift upgrades Ventilation and smoke extraction improvements M&E systems upgrade as part of compliance works Compliance and Specialist Surveys, including: Fire risk assessments Intrusive investigations removal and management

Katy Reed

Published 15 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete