SCC APC St Pauls Infant to Primary Tongham

Award

Value

£4,125,000

Classifications

  • Building construction work

Tags

  • award

Submission Deadline

9 months ago

Published

7 months ago

Description

Surrey County Council in conjunction with the Governing Body of St Paul's CofE Infant School is proposing to extend the age range and premises of St Paul's CofE Infant School from 4-7 years to 2-11 years, making the school a one form of entry primary school (210 pupils).
      A proposed scheme has been developed to address the key, headline deficiencies and/or differences between the existing school and BB103 as a result, the scheme is to recommend the permanent retention of the existing building, with internal alterations and refurbishment, along with a new build extension.
      
      The works and timescale objectives are: 
      •	Phase 1 - 
      The first phase of works to be completed to accommodate the first September 2025
      •	Phase 2 
      September 2026

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

West Bampton Road Design and Build

This is to inform suppliers on the upcoming tender for the following: Proposal: Design and construction (post RIBA stage 3) of 7 dwellings (2 x 1bd bungalow, 3 x 2bd houses and 2 x 3bd houses), and associated works to the car park as per planning consent 23/00886/FUL. Site: Land to the west of Bampton Road, Leigham, Plymouth Service required: Procurement of the Contractor, for the design and build post RIBA stage 3, of 7.no new affordable dwellings, with associated hard and soft landscaping (including external works to the public car park). Description: The site is (0.35ha) located to the west of Bampton Road, and is an existing, non-demarcated, surface level, public car park. The site (0.12ha) on which the affordable dwellings will be built is owned by PCH. The dwellings will need to be delivered in accordance with Plymouth Community Homes, Employers Requirements. External material, approved by planning include brick finish to walls, roof tiles and grey UPVC fenestration. The energy strategy consists of ASHP, with PV's to the roof. The remainder of the car park (0.23ha) is owned by Plymouth City Council, and the improvement works will be undertaken via license. The improvement works to the car park consist of, but not limited to, white lining (circa 66 public car parking spaces), site grading and kerbing, surface water drainage works and soft/hard landscaping. Please see attached additional documents: proposed Site Plan & Location Plan. Form of appointment: D&B, JCT 2024 contract, as amended by the PCH schedule of amendments. Tender process: Single stage, open tender. The tender will be administered via the PCH Mercell portal. Estimated Timeline: Tender Publication Date: September 2025 Tender Award: December 2025 Expected Contract Start Date: December 2025 Expected Construction Start Date: Spring 2026 Construction Practical Completion Date: Early Summer 2027 Contract End Date: Early Summer 2028

Katy Reed

Published 5 days ago
Open

West Bampton Road Design and Build

This is to inform suppliers on the upcoming tender for the following: Proposal: Design and construction (post RIBA stage 3) of 7 dwellings (2 x 1bd bungalow, 3 x 2bd houses and 2 x 3bd houses), and associated works to the car park as per planning consent 23/00886/FUL. Site: Land to the west of Bampton Road, Leigham, Plymouth Service required: Procurement of the Contractor, for the design and build post RIBA stage 3, of 7.no new affordable dwellings, with associated hard and soft landscaping (including external works to the public car park). Description: The site is (0.35ha) located to the west of Bampton Road, and is an existing, non-demarcated, surface level, public car park. The site (0.12ha) on which the affordable dwellings will be built is owned by PCH. The dwellings will need to be delivered in accordance with Plymouth Community Homes, Employers Requirements. External material, approved by planning include brick finish to walls, roof tiles and grey UPVC fenestration. The energy strategy consists of ASHP, with PV’s to the roof. The remainder of the car park (0.23ha) is owned by Plymouth City Council, and the improvement works will be undertaken via license. The improvement works to the car park consist of, but not limited to, white lining (circa 66 public car parking spaces), site grading and kerbing, surface water drainage works and soft/hard landscaping. Please see attached additional documents: proposed Site Plan & Location Plan. Form of appointment: D&B, JCT 2024 contract, as amended by the PCH schedule of amendments. Tender process: Single stage, open tender. The tender will be administered via the PCH Mercell portal. Estimated Timeline: Tender Publication Date: September 2025 Tender Award: December 2025 Expected Contract Start Date: December 2025 Expected Construction Start Date: Spring 2026 Construction Practical Completion Date: Early Summer 2027 Contract End Date: Early Summer 2028

Katy Reed

Published 5 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete