Consultancy Support Services -Technical Project Management, Quantity Surveying (Cost Consultancy and Contract Administration) and Client Representative Services; RIBA Stages 2-6

Award

Value

£100,000

Classifications

  • Architectural, construction, engineering and inspection services

Tags

  • award

Submission Deadline

1 year ago

Published

6 months ago

Description

This tender relates to Herefordshire Council's requirement for Project Management, Quantity Surveyor (Cost Consultancy and Contract Administration) and Client Representative Services as part of a multi-disciplinary design team for the design work at Ross Enterprise Park Phase 1 RIBA Stages 2-6. \r
\r
Herefordshire Council has published this contract opportunity on the 'Supplying the Southwest Portal'. To view the documentation related to this opportunity you will need to register on the portal if you are not already registered with Procontract, and express an interest in the opportunity.\r
\r
To register with Procontract on the Supplying the Southwest Portal, click on the link below or copy and paste the link into your browser's address bar: https://www.supplyingthesouthwest.org.uk \r

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

CUE & Butterfly House Decarbonisation

The Butterfly House and Centre for Understanding the Environment (CUE) are located within the wider Horniman Gardens site, which is a Grade II listed Park and Garden. The CUE was constructed in 1995 and was originally intended as a temporary structure with an expected lifespan of 20 years. The Butterfly House was constructed in 2016. The Horniman wish to partner with a design and engineering supplier who will support the decarbonisation of the above listed buildings. Works include: Design works in line with RIBA stages 3-6: Main Designer role: - developing the outline design. - Determine the requirement on planning application and listed building consent. - detailed design drawing package. - prepare tender package and specifications for installation. - evaluate tender package and monitor and report on the cost plan. - appoint and manage the design team (M&E engineer, Structural engineer). - coordinate with the design team. - updating design while on site. - coordinate design changes. Project management and coordination: - coordinating the design development approval between the design team, The Horniman team and Salix (distributors of Public Sector Decarbonisation Fund Phase 4). - coordinating the works implementation & program between the museum team, the contractor and Salix. Principal Designer under CDM and Building Regulations: - Building control application preparation and submission. - PD duties for both CDM and Building Regulations. - PD duties for both CDM and Building Regs including the preparation and share of the Health and Safety File. - Organise Building control visit and share information at key stages. Contract Administrator (traditional route contract) or Employer's Agent (D&B contracts) - responsible for administering the construction contract including (non- exhaustive list): drafting contract documents for execution, issuing instructions, considering claims for extension of time, issuing certificates interim certificates for payment, practical completion certificates, etc

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete