Shafton Rec Play Area Refurbishment

Award

Value

£35,426

Classifications

  • Recreational, cultural and sporting services

Tags

  • award

Submission Deadline

10 months ago

Published

10 months ago

Description

Shafton Recreation Ground play area renovation, including new equipment and renovation of existing equipment, surfacing etc.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Callington Skate Park

Construction Plan 1. Scope of Works. The works will include: • Site preparation and demolition of existing fence. • Earthworks, grading and sub-base preparation. • Installation of drainage systems. • Construction of reinforced concrete skatepark elements (bowls, ramps, platforms, coping). • Installation of street-style features (rails, ledges, stairs). • Perimeter works including pathways and landscaping. • Site clean-up, quality checks, and handover. 2. Methodology 2.1 Mobilisation • Establish site compound, temporary fencing and signage. • Set out works in accordance with approved design drawings. • Conduct pre-start meetings with subcontractors and suppliers. 2.2 Site Preparation • Clear vegetation, debris and unsuitable materials. • Carry out excavation to design levels. • Import and compact subgrade fill where required. 2.3 Drainage & Utilities • Install sub-surface drainage to prevent water pooling. • Connect to existing stormwater infrastructure. • Install conduits for future lighting and services. 2.4 Concrete Works • Coping and edging hot dipped galvanised. Cut ends to be treated with corrosion resistant paint system • Formwork, steel reinforcement and shotcrete application for bowls and ramps. • Machine finishing followed by hand-trowelling for smooth riding surfaces. • Expansion joints, coping stones and steel edges installed. 2.5 Ancillary Works • Install prefabricated hot dipped galvanised rails, ledges and modular features. • Construct pathways, seating areas and viewing zones. • Landscape the surrounding area. 3. Health, Safety & Environmental Management • Works to be carried out in accordance with [local construction safety legislation]. • Dust suppression and noise control measures. • Daily toolbox talks and risk assessments. • Waste management and recycling plan. • Public safety maintained through secure site fencing and restricted access. • Working hours 0800 to 1700. • All operatives working on site should have relevant CSCS cards.

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete