QUB/2582/24 - Measured Term Contract for Building, Mechanical and Electrical Minor Works and Maintenance Services

Open

Value

£0

Classifications

  • Building construction work
  • Mechanical and electrical engineering services
  • Electrical installation work
  • Mechanical installations
  • Repair and maintenance services of electrical and mechanical building installations

Tags

  • tender

Submission Deadline

1 month from now

Published

1 day ago

Description

Queen’s wishes to appoint an experienced Contractor to implement a Measured Term Contract (MTC) for building, mechanical and electrical minor works and maintenance services throughout the entire University campus.  The Form of Contract will be the JCT Standard Form of Measured Term Contract 2016 Edition, incorporating Queen’s standard amendments and the adaption schedule for Northern Ireland.Works carried out under the Contract shall be valued in accordance with the Rates inserted in Appendix 1 – Tender Response (Price) and the published editions of the PSA Schedules of Rates as follows.•	PSA Schedule of Rates for Building Works, 11th Edition 2015•	PSA Schedule of Rates for Electrical Services, 7th Edition 2016•	PSA Schedule of Rates for Mechanical Services, 7th Edition 2016

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

24 063 - Supply and Installation of Level Access Showers

We (the Council) want to appoint a single Contractor with the right technical skills and experience to this Level Access Showers Framework. The Contractor must have the right technical skills and experience to deliver high quality building works that are affordable to the public purse. The Contractor must be trustworthy so they can work in vulnerable people's homes and must be very customer focused, flexible and accommodating of the needs of vulnerable people when working in their homes. Any work awarded through this Framework will be carried out in occupied domestic premises; it is important for Contractors to be aware of this when tendering for this Framework. This procurement exercise will be conducted on Cheshire East Borough Council electronic Contract and Tender Management System at the www.the-chest.org.uk Organisations will be invited to bid and will need to provide the additional required information through the Contract and Tender Management System. If you have any technical problems with The Contract and Tender Management System please contact the help-desk on: [email protected] or 0330 005 0352. In order to participate, providers must register, complete and upload completed documentation and submit this via the Chest at the link provided in this notice. The project reference on The Chest is DN749702. The values given in this notice are only estimations - the Council gives no guarantee or warranty or makes any representation as to the accuracy of any indicative values

Open

DV4 Enterprise

Scottish Water is seeking to appoint suitably experienced Asset Delivery Partners and Primary Designer(s) and to deliver our SR27 and SR33 programme of capital works. SR27 is the regulatory period spanning from April 2027 until March 2033. SR33 is the regulatory period spanning from April 2033 until March 2039. Scottish Water aim to award this procurement by March 2026. It will run for a fixed period of seven years until March 2033 with an option to extend for a further six years until March 2039. <br/><br/>The Construction, Design and Management (CDM) 2015 Regulations will apply. Successful bidders will be required to utilise Scottish Waters Supply Chain and Specialist Frameworks. <br/><br/>To deliver the Capital Investment Programme SW is creating an Enterprise, an advanced partnering supply chain model which includes Asset Delivery Partners (ADP) and Primary Designer(s) (PD) working together in high performing integrated teams to deliver programmes of work. <br/><br/>The Enterprise model will have a dynamic outcome-based set of measures, with partners incentivised against service sub-programme and Enterprise outcomes and SW will have embedded resources within the Enterprise. There will also be minimum business performance thresholds in the form of KPI’s.<br/><br/>The Enterprise will incorporate enhanced partnering capabilities and a behavioural environment supporting closer resource integration, combined with a trading environment that also supports this approach. This will deliver affordability to support our investment targets, whilst also being adaptable and flexible enough to support changing requirements. <br/><br/>There will be collective focus on Beyond Zero Harm which helps us drive towards improving health, safety and wellbeing and partners will support Scottish Waters Beyond Net Zero ambitions.<br/><br/>This enterprise model procurement will be structured into two Lots: Lot 1 Primary Designer/s, Lot 2 Asset Delivery Partners

Scottish Water

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete