Commercial Workspace Development - Langage South

Award

Value

£5,949,318

Classifications

  • Building installation work

Tags

  • award

Submission Deadline

9 months ago

Published

5 months ago

Description

Design and Build of a commercial / industrial workspace scheme located off Beaumont Way, Langage South Business Park, Plympton, Plymouth, PL7 5FL.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

The Windsor Boys' School D-Block Roof Replacement

The complete replacement of The Windsor Boys School D Block Roof. The roof has been split into 3 sections. The dimensions of the roofs are: Roof 1 - 800m2 Scope of works: • Strip existing tiles, felt & batten, renew with premium treated BS5534 - compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge tiles with Redland Concrete half-round ridge tiles and dry ridge kit. • Install new eaves trays, fascia vents and comb fillers. • Clear all waste and debris from site. • Scaffolding Roof 2 - 920m2 Scope of works: • Strip existing tiles, felt & batten, Renew with premium treated BS5534- compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge/hip tiles with Redland Concrete half-round ridge/hip tiles and dry ridge kit. • Remove existing verge & install new dry verge unit with end caps. • Remove existing valley & install new dry valley trough. • Install new eaves trays, fascia vents & comb fillers. • Replace all lead flashing as required. • Clear all waste & debris from site. • Scaffolding • Remove existing Velux rooflights and install 8no PK08 & 3no FPK08 Velux units with associated flashings. Roof 3 - 520m2 Scope of works: • Strip existing tiles, felt & batten, Renew with Premium treated BS5534- compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge/hip tiles with Redland Concrete half round ridge/hip tiles and dry ridge kit. • Remove existing verge & install new dry verge unit with end caps, • Install new eaves trays, fascia vents & comb fillers. • Clear all waste and debris from site. • Scaffolding All works must be guaranteed for 30 years

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete