MDDC202408-008-Tiverton Work Hub - Building refurbishment - Appointment of a contractor

Award

Value

£250,000

Suppliers

Classifications

  • Building construction work

Tags

  • award

Submission Deadline

6 months ago

Published

4 months ago

Description

Mid Devon District Council are working on a project to create a work hub in Tiverton Town Centre utilising a former youth centre building.  We are seeking to appoint a main contractor to undertake conversion/refurbishment works to the building.\r
\r
The works will include:\r
•	Enlarged window and door openings including new windows and doors\r
•	Removal of internal wall\r
•	New floor and wall finishes\r
•	New kitchen, fixed furniture and replacement sanitary ware\r
•	Mechanical & Electrical Works - new boiler, new power and data, lighting, alterations to heating system, ventilation, relocating \r
        water meter. \r
•	New external pergola and external works\r


Additional information: 
Tender documents are accessible via www.advantageswtenders.co.uk . All expressions of interest are to be made via www.advantageswtenders.co.uk. All questions or enquiries regarding the tender are to be asked via the messaging function within the opportunity through www.advantageswtenders.co.uk

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor's compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 3 days ago
Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor’s compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete