Description

HARROW ROAD SHOPFRONT IMPROVEMENT WORKS PHASE 1 - 14 units

Westminster City Council are seeking to appoint an experienced contractor with a track record of delivering high quality shopfront improvements to deliver the Harrow Road shopfront improvement works. The scheme includes works to 14 units and is predominantly funded by the UK Shared Prosperity Fund (UKSPF) which expires at the end of the financial year. Westminster City Council (WCC) aims to deliver this project within an accelerated timeline to meet the deadlines tied to the UK Shared Prosperity Funding (UKSPF) allocated to the project. The target completion date is May 2025. 

Proposed works cover includes but is not limited t new traditional painted timber fascia signboards to all, with painted lettering/graphics and restoration of traditional cornice profiles in timber, installation of new lighting fixtures, new traditional Victorian awnings, minor repairs and decorations to existing shopfronts, pilasters and cornices (no new shopfronts) and alterations to existing shopfronts in a small number of cases (tiles, doors, rollers, glazing etc).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Refurbishment and Upgrade of Dunnet head Lighthouse

Refurbishment and Upgrade of Dunnet Head Lighthouse The main items of project work are as listed below:- -Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work. The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts’ guide for sampling, analysis and clearance procedures” and HSG264, Asbestos: The survey guide. -Full Electrical strip out and rewire of entire station with new equipment. -Full Civil renovation to Lighthouse, Lighthouse Bothy, and Foghorn tower. -De-mobilise site and clear all surplus project materials and plant, with the disposal of excess project materials to appropriate licensed and registered dumps. -The Principal Contractor is to supply the NLB Project Engineer with ‘as-built’ information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with current CDM Regulations. -During the proposed works, it is essential that the Aids to Navigation are not prevented from operating at any stage that they are required. Details will be provided on the basic operation of these items to allow the Contractor to prevent his operatives from affecting the Aids to Navigation. For more information about this opportunity, please visit the Delta eSourcing portal at: https://nlb.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Painting-and-glazing-work./NUU46793BV To respond to this opportunity, please click here: https://nlb.delta-esourcing.com/respond/NUU46793BV

Katy Reed

Published 1 hour ago
Open

External & Communal Pre Construction Services and Works to Houses Framework Rev01  CRN00039877

External & Communal Pre Construction Services and Works to Houses Framework Rev01 Multiple Supplier Framework (of up to three contractors per Lot) to undertake various services and works related to improvement and planned maintenance works, by means of Pre-construction Services Call-offs and Works Call-offs. This Framework is to be split into 3no Lots as follows: LOT 1, Pre-Construction Services and External works, to low rise properties LOT 2, Pre-Construction Services and External works, to high rise properties LOT 3, Pre-Construction Services and Communal works, to low rise and high rise properties The following descriptions are indicative of the types of services and works that may be commissioned under each Lot. In addition, other similar services and works may also be commissioned. Bidders should note that the estimated value below consists of the provisional budget allocated within the capital plan for all contractors. The actual value per contractor will be expected to be a much smaller proportion following distribution of work amongst an anticipated 3no framework contractors per lot. Work and budgets per contractor will also be affected by work carried out by direct in-house resources, contingency allowances, non-access to properties, efficiency savings, and subject to regular reviews and re-allocations of priorities by the Council. The non-binding target is that each framework contractor would receive approximately: Lot1 GBP2-4Million of work turnover per year; Lot2 GBP1-2Million of work turnover per year; Lot3 GBP0.3-1Million of work turnover per year; The framework contractors will also be required to perform to the council's key performance indicator targets, and community benefits expectations (described elsewhere) Types of work that may be awarded to framework contractors, but is non-binding, is detailed below: LOT 1 Pre-Construction Services and External works, to low rise properties Repairs and/or installation of: external masonry, concrete and joinery flat and pitched roof coverings, external and cavity wall insulation, and related works Door/window/screen replacements Photo voltaic panels and/or air source heat pumps Repositioning and/or replacing drainage, rainwater goods, and other services to facilitate external wall insulation/render works Utility company coordination so as to reposition and/or replace gas pipework, meters etc Any other relevant services or works LOT 2 Pre-Construction Services and External works, to high rise properties Repairs and/or installation of: external masonry, concrete and joinery flat roof coverings external and cavity wall insulation, and related works Door/window/screens Repairs and/or renewing lightning protection and roof ventilation fans Repositioning and/or replacing drainage, rainwater goods, and other services to facilitate external wall insulation/render works Any other relevant services or works LOT 3 Pre-Construction Services and Communal works, to low rise and high rise properties Repairs and/or installation of: Communal door/window/screens Foyer/communal hall/stair upgrading Firestopping, smoke control ventilation Below and above ground drainage lightning protection and mechanical ventilation door entry systems and communal lighting electrical switchgear, distribution and containment fire/smoke detection fire alarms fire suppression systems Communal potable water tank replacements Communal space heating replacements Communal hot & cold water services replacements Automatic Controls for communal mechanical and electrical services Fire Panel Controls for communal fire protection Lift replacements Any other relevant services or works

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete