1NextGen Electrolysis - Blending Equipment
Buyers
Value
£0
Classifications
- Gas network equipment
- Instrumentation and control equipment
- Instruments for measuring flow, level and pressure of liquids and gases
- Industrial process control equipment
- Gas pressure equipment
- Gas regulation equipment installation work
Tags
- tender
Submission Deadline
3 weeks from now
Published
1 week ago
Description
WWU require a supplier to design and install a hydrogen blending unit and associated equipment to blend up to a maximum of 20% hydrogen by volume into the customers' existing natural gas supply. The injection will take place downstream of the meter where the end use is combustion to provide heat to the customers existing process. The customer process in non-interruptible and should the blend ratio go above the maximum allowable or if there is any failure of the hydrogen supply the blending infrastructure must be able to revert to 100% natural gas in order to maintain supply to the customer. The blending infrastructure will need to be able to meet the requirements set out in the scope. These requirements are taken from the recently published FUNCTIONAL SPECIFICATION FOR HYDROGEN BLENDING INFRASTRUCTURE a copy of which can be found in Appendix 1 in the scope. WWU will own and operate the hydrogen blending unit and any associated equipment which will be located at the customers site in line with Model 2 in the functional blending spec.
Similar Contracts
Open
United Kingdom Atomic Energy Authority
Published 3 weeks ago
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Timeline active
Evaluate
Award
Complete