GMCA 1231 FSHQ Heads of Service Office Works

Award

Value

£189,988

Suppliers

Classifications

  • Construction work

Tags

  • award

Submission Deadline

11 months ago

Published

9 months ago

Description

supplier appointment for a Design & Build contract for the FSHQ Heads of Service Office Works. Direct Award to Parr Group via the NHS SBS Framework.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

5471 – Bedwas High School, Boiler Replacement

Caerphilly CBC are inviting contractors to submit a tender for the replacement of the main boilers serving blocks A+B at Bedwas High School, Newport Road, Bedwas, Caerphilly. The scope of the project is fully described in the ITT. In summary the scope is: The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period Carefully survey all services in the existing plant rooms and remove all redundant mechanical and electrical services including any brackets and containment and all redundant plant bases. The contractor shall form new openings in the outside wall to install new weather louvres at high and low level. The contractor shall adapt and make good the plant bases which are to be re-used. The contractor shall install and set to work all new plant and controls generally as shown on the tender drawing. All new and existing services within the boiler room are to insulated as specified. The contractor shall employ the boiler manufacturer’s commissioning engineers to commission the new boilers and certificate them. Employ specialist commissioning engineers to hydraulically balance all system and sub circuits, and demonstrate the correct operation of all systems to the satisfaction of the contract administrator. The timescale for the work is 6 weeks from commencement of the contract. Contractors shall note that the work may continue into the school term time when pupils will be on-site and must make all allowances for segregating and securing the works area. Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the 6-week period given. Full details are provided in the ITT on Proactis Plaza

Katy Reed

Published 8 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete