Supply and Installation of Bathrooms

Award

Value

£0

Classifications

  • Bathroom furniture

Tags

  • award

Submission Deadline

5 months ago

Published

4 weeks ago

Description

The PCH is seeking suitability qualified suppliers to respond to this ITT for the Supply & Installation of Bathrooms.   Contractor to undertake initial survey of each property issued on the proposed programme of works to identify extent of work required. Photographic evidence to be provided. Any property identified as requiring full replacement bathroom to be identified and brought to the attention of the supervising officer for consideration and instruction to continue

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Framework for Disabled Adaptations

The Council intends to appoint up to Four (4) Suppliers to the framework and up to Two (2) Suppliers as reserves. The suppliers will be offered work on a rotational basis with priority for the first Four (4) Suppliers. This Framework will operate for a period of two (2) years, with the option to extend for up to an additional two (2) years. - The Vale of Glamorgan Council requires disabled adaptation works that assist individuals to retain their independence at home. A Disabled Facilities Grant (“DFG”) is available to assist eligible people to adapt their homes in the Vale of Glamorgan. It is subject to person and property eligibility which is assessed by the Council. The properties included in the Framework will be privately owned either by the DFG Applicant or their landlord or Council Tenants. Permission for access and to complete the works will be obtained by the Council as part of the DFG process. - To assist eligible people for a DFG (DFG Applicants), the Council offers a Disabled Facilities Agency Service (the Agency Service). Where DFG Applicants choose to employ the Agency Service, the Council will provide a full service in preparing plans, preparing and submitting the formal grant application, supervising works on site and certifying the works on completion. Over the last four (4) years, the Council’s Agency Service has used an Adaptations Framework working with several Suppliers to deliver the adaptation works DFG Applicants require, removing the need for each individual grant to be tendered. - In addition to the above, this framework may be used by the Council’s, Council Housing Adaptations Team (CHAT) to support the delivery of adaptations within its council housing stock for tenants identified as requiring support to continue living independently. The Council has approximately 4,000 properties within its portfolio and the successful contractor(s) will be engaged by the Housing and Building Services Adaptations Team to deliver adaptations. - The following list includes examples of the type of Works that may be required. i. Access to and from Dwelling - External ramping, fixed and temporary - Low threshold doorways - Door entry systems ii. Making dwelling safe - Removable of trip hazards as assessed iii. Accessing principle family room - Widening doorways/structural openings - Hallway alternations iv. Accessing room for sleeping - Altering internal room arrangements - Through floor lift v. Access to lavatory - Installing specialist equipment, e.g. clos-matt - New partitioning in existing room vi. Access to bath/ shower - Removing existing facilities and refitting with adapted equipment, e.g. - Level access shower - Specialised Shower Screen - Thermostat control shower - Anti-slip flooring - Grip rails - Specialised seats - Specialist baths - Creation of wet room - Specialist Shower cubicle - Shower/ changing tables - Specialist W.C. - Hoist Ceiling Rails when access between rooms are required - Specialist drying equipment vii. Access to hand washing facilities - Install W.H.B in bedrooms viii. Facilitating food preparation and cooking - Specialist kitchen equipment ix. Improving and providing heating - Installing additional sources of heating x. The Construction of Extensions to house adaption which can’t be accommodated with the existing floor print of the property. - Ground Floor bedroom - Ground floor bathroom or w.c. - Combination of both - Loft conversion

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete