12379 CRSTS Highway Capital Maintenance Programme 2024/25 - Carriageway Resurfacing Works (Bulk Tender Number 2)

Award

Value

£2,238,000

Classifications

  • Carriageway resurfacing works

Tags

  • award

Submission Deadline

5 months ago

Published

4 months ago

Description

St Helens Borough Council is seeking to appoint a suitably qualified contractor for the CRSTS Highway Capital Maintenance Programme 2024/25 - Carriageway Resurfacing Works (Bulk Tender Number 2).\r
\r
Carriageway resurfacing will be on the following roads:\r
\r
1.	Coldstone Drive - Billinge & Seneley Green\r
2.	Garswood Road - Billinge & Seneley Green\r
3.	Leyland Green Road - Billinge & Seneley Green\r
4.	Strange Road - Billinge & Seneley Green\r
5.	Trent Road - Billinge & Seneley Green\r
6.	Avon Road & Trent Road - Billinge & Seneley Green\r
7.	Whiteside Road - Blackbrook\r
8.	Clipsley Lane - Haydock\r
9.	Penny Lane - Haydock \r
10.	Queens Road - Haydock\r
11.	Mercer Street - Newton East\r
12.	Mill Lane - Newton East \r
13.	Wargrave Road - Newton East \r
14.	Queens Drive - Newton West \r
15.	Broad Oak Road - Parr\r
16.	Fleet Lane - Parr Phase 1 \r
17.	Fleet Lane - Parr Phase 2 \r
18.	Malvern Road - Parr\r
19.	Ormskirk Road - Rainford \r
20.	Alder Hey Road - Windle \r
21.	Queens Drive - Windle \r
22.	Stuart Road - Windle\r
\r
For a full specification for this opportunity, please register you interest.\r
\r
Submissions shall be received by the Council by the closing date and time stated within the Instruction for Tendering document.  No submission received after the closing date and time will be accepted other than where there are exceptional circumstances which may be considered by the Director of STAR Procurement in their sole discretion.  Please note that tender submissions which are only partly uploaded at the closing date and time will be considered to have not been received and will be rejected by the Council.\r
\r
In submitting your quotation you agree to contract on the terms and conditions as detailed on The Chest. Due to the Council's obligations of fairness and equal treatment to all bidders it cannot accept amendments to these terms and conditions or alternative terms and conditions. If you seek to amend the terms and conditions or submit alternative terms and conditions the Council may reject your quotation.\r

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Legacy Concrete Roads Reconstruction Framework

National Highways are proposing to put in place a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes: • design and subsequent construction services for: - demolition of existing concrete pavements, - reconstruction of pavements (including new pavement furniture and markings) • design and delivery of associated temporary traffic management solutions, • when instructed: - involvement in optioneering, - design and construction of alterations to those legacy assets which interface with the replacement pavements’ designs, which may include sub-surface drainage, street furniture and its foundations and signage, - design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings), • performing principal designer and principal contractor duties as defined under the “Construction (Design and Management) Regulations 2015” (“CDM Regulations 2015”) • carbon capture recording and reporting, • recovery, recycling and reuse of arisings during the delivery of a scheme, • engagement with all identified stakeholders, and • identification, recording and realisation of programme efficiencies. The LCRR framework will be six years in duration to ensure alignment to and coverage of the RIS3 funding period (2025-30) but also to overlap with the beginning of RIS4 (2030-35) in case of any delays in approvals of the strategy or funding for RIS4. This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations. From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement. The procurement documents can be accessed via https://nationalhighways.ukp.app.jaggaer.com/esop/ogc-host/public/nationalhighways/web/login.jst?_ncp=1668156695442.1319654-1, under Invitation To Tender 878 (ITT_878).

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete