ISO 11 Incinerator Life Extension Project - CEMS
Buyers
Value
£130,000
Classifications
- Waste incinerators
Tags
- tender
Submission Deadline
1 day ago
Published
1 month ago
Description
The contract is for a single supplier to provide Design and Build of Work Package 3 - Design and Build of a Replacement Continuous Emissions Monitoring System (CEMS) and Secondary chamber Oxygen monitoring with new system(s), compliant with all current standards, as per the user requirement specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF. The scope of this contract is to replace the CEMS and Oxygen Analyser to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years. The scope of works will involve: • Detailed design work for the new CEMS and Oxygen Analyser, ensuring it complies with the URS and all applicable standards • Supply, manufacture, delivery and installation of the new CEMS and Oxygen Analyser • Offline commissioning of the new CEMS and Oxygen Analyser o It is a recommended that as much pre-commissioning works takes place prior to the shutdown • During the scheduled shutdown, the field sensors will be installed. • Final commissioning with the incinerator in operation. • On completion of commissioning, remove and dispose of existing CEMS from Incinerator Plantroom. • Management of all subcontractors employed by the supplier to complete these works. • Training and Operational Procedures • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all drawings, point to point testing and SAT commissioning. A separate section should be provided to show details of the following: o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome. A CDM Construction site will be set up as part of the overall project which will provide for the following: • Site Supervision • HERRAS fencing and appropriate signage around CDM area • Site Office • Welfare Office including changing areas • Waste skips • Scissor lift • Fork-lift truck / telehandler • CDM documentation / inductions / daily logs / management of RAMS For this tender, the supplier is required to provide a cost for annual servicing of the new CEMS and Oxygen Analyser. The requirements for this service contract are: • 12-month routine service, preventative maintenance & calibration services • Critical Spares List showing the itemised costs • Work Rates for additional works required outside the scope of the routine service. Additional information: Please note that Appendix H - Confidentiality Agreement must be completed, signed, and emailed to [email protected] asap. Then and only then will access to the full ITT package (6. Appendix E1 - Site Documents & 6. Appendix E2 - Existing CEMS Drawings) be granted to the requester.
Similar Contracts
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!