NHSScotland Lead Advisor Consultant Framework (2023)

Award

Value

£20,000,000

Classifications

  • Architectural, construction, engineering and inspection services
  • Architectural and related services
  • Architectural services for outdoor areas
  • Advisory architectural services
  • Architectural design services
  • Architectural services for buildings
  • Urban areas mapping services
  • Organisation of architectural design contests
  • Engineering services
  • Consultative engineering and construction services
  • Infrastructure works consultancy services
  • Transport systems consultancy services
  • Civil engineering consultancy services
  • Urban planning and landscape architectural services
  • Urban planning services
  • Landscape architectural services
  • Landscape gardening services
  • Construction-related services
  • Site-investigation services
  • Construction supervision services
  • Construction-site supervision services
  • Construction consultancy services
  • Construction management services
  • Construction project management services
  • Technical testing, analysis and consultancy services
  • Technical building-inspection services
  • Technical inspection services of engineering structures
  • Technical inspection and testing services
  • Technical analysis or consultancy services

Tags

  • award
  • contract

Published

11 months ago

Description

This Framework will provide Lead Advisor services to Framework Customers (as further described in the
Statement of Requirement). The role of the Lead Advisor is varied and may include
a range of advisory, design discipline, inspection and supervision services and building surveying inputs to health and social care
programmes of work and projects to be delivered via a variety of procurement routes. It will be a key requirement of this Framework
to provide an integrated Advisor service for construction projects procured under the NEC4 suite of contracts.
The authority is not able to guarantee the volume, type or value of any work called off under the framework however the current estimate
of the total potential value over the term of the framework is noted within the contract notice. The current realistic anticipated framework expenditure is circa 10 million GBP, however the maximum anticipated expenditure for the framework is 20million GBP given the potential for additional funding to be allocated to the NHSScotland Capital Programme over the life of the framework.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Northwest Contractor Framework

Wirral Borough Council (the "Council") as the Contracting Authority in partnership with Procure Partnerships intends to let a Closed North West Contractor Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for the Council's pipeline of works and will be accessible by North West Public Sector Bodies / Contracting Authorities. The Framework consists of Thirteen Lots broadly categorised as Construction Lots (Lots 1-6) / Infrastructure Lots (Lots 7-12) / Demolition Lot (Lot 13). The Council aims to appoint Ten Contractors to each Framework Lot, except for Lot 13 Demolition which will have one single contractor. Lots 1 - 12 will be accessible by Public Sector Bodies / Contracting Authorities in the North West Region UKD). Lot 13 will be accessible by Public Sector Bodies / Contracting Authorities in the Merseyside Region UKD7 only. Where there are ten suitable applicants, the highest scoring ten Contractors for each Lot will be awarded a place on that Framework Lot, and will be ranked from one to ten: the highest scoring Contractor becoming the Rank 1 Contractor, the second highest becoming the Rank 2 Contractor etc. Should a Contractor decline to accept their offered place on the Framework, then a place may be offered to the next highest scoring Contractor (i.e., who may have come eleventh). The Council will also offer one reserve place to Lot 13 Demolition. The Reserve Contractor will be the Tenderer which ranked second. The Reserve Contractor may be brought on to the Framework at any stage during its term where the Council permanently excludes or terminates the Framework Agreement with a Contractor (having won a place on the Framework) for poor performance or otherwise (e.g., insolvency) as provided for in the Framework Agreement. The Reserve Contractor may be brought onto the Framework if the Rank 1 Contractor declines an opportunity from an End User for any reason. As such, the Reserve Contractor will to be required to sign a variation of the Framework Agreement at the point in time that they are invited onto the Framework. The intended number of ten Contractors per Lot may be varied: The maximum number of Contractors awarded a place on each Lot may increase only where two or more suppliers have tied scores, and are jointly placed in the last position (tenth) in respect of each Lot. In such a case, the Contractors who are tied with the same score in the last position for each Lot shall be deemed to be one Contractor for the purpose of calculating the maximum number of Contractors for each Lot. The Council will award a Framework Agreement to additional Contractors where their final score is within 0.01 - 1.00% of the awarded last place position only. For the avoidance of doubt, last position for each lot is tenth position. Only one contractor will be awarded a place on Lot 13 Demolition. One reserve place will be allocated to Lot 13. Where two or more Contractors have tied scores and are in any position except for the last (tenth) position for each Lot, the number of Contractors will fill the positions immediately following the position that they have tied for. For example, where two Contractors are tied in the sixth position, they will occupy the sixth and seventh positions. For example; where three Contractors are tied in the sixth position, they will occupy that sixth position as well as the seventh and eighth position respectively for the purpose of calculating the maximum number of Contractors in respect of the Lot in question. If less than ten Contractors meet the selection criteria to get on each Framework Lot, the Council reserves the right to proceed to establish the Framework with less than ten Contractors on each Lot or to cancel the procurement of that Lot. Further where a Contractor's total score (based on the technical and commercial award criteria) for a Lot ranks them within the top ten Contractors but is under 50%, then on the basis that the Council does not wish to compromise on the calibre of appointed Contractors, the Council reserves the right not to offer them a place on the Framework, and to proceed to award that Lot to less than ten Contractors.

Katy Reed

Published 1 day ago
Open

Northwest Contractor Framework

Wirral Borough Council (the "Council") as the Contracting Authority in partnership with Procure Partnerships intends to let a Closed North West Contractor Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for the Council's pipeline of works and will be accessible by North West Public Sector Bodies / Contracting Authorities. The Framework consists of Thirteen Lots broadly categorised as Construction Lots (Lots 1-6) / Infrastructure Lots (Lots 7-12) / Demolition Lot (Lot 13). The Council aims to appoint Ten Contractors to each Framework Lot, except for Lot 13 Demolition which will have one single contractor. Lots 1 - 12 will be accessible by Public Sector Bodies / Contracting Authorities in the North West Region UKD). Lot 13 will be accessible by Public Sector Bodies / Contracting Authorities in the Merseyside Region UKD7 only. Where there are ten suitable applicants, the highest scoring ten Contractors for each Lot will be awarded a place on that Framework Lot, and will be ranked from one to ten: the highest scoring Contractor becoming the Rank 1 Contractor, the second highest becoming the Rank 2 Contractor etc. Should a Contractor decline to accept their offered place on the Framework, then a place may be offered to the next highest scoring Contractor (i.e., who may have come eleventh). The Council will also offer one reserve place to Lot 13 Demolition. The Reserve Contractor will be the Tenderer which ranked second. The Reserve Contractor may be brought on to the Framework at any stage during its term where the Council permanently excludes or terminates the Framework Agreement with a Contractor (having won a place on the Framework) for poor performance or otherwise (e.g., insolvency) as provided for in the Framework Agreement. The Reserve Contractor may be brought onto the Framework if the Rank 1 Contractor declines an opportunity from an End User for any reason. As such, the Reserve Contractor will to be required to sign a variation of the Framework Agreement at the point in time that they are invited onto the Framework. The intended number of ten Contractors per Lot may be varied: The maximum number of Contractors awarded a place on each Lot may increase only where two or more suppliers have tied scores, and are jointly placed in the last position (tenth) in respect of each Lot. In such a case, the Contractors who are tied with the same score in the last position for each Lot shall be deemed to be one Contractor for the purpose of calculating the maximum number of Contractors for each Lot. The Council will award a Framework Agreement to additional Contractors where their final score is within 0.01 - 1.00% of the awarded last place position only. For the avoidance of doubt, last position for each lot is tenth position. Only one contractor will be awarded a place on Lot 13 Demolition. One reserve place will be allocated to Lot 13. Where two or more Contractors have tied scores and are in any position except for the last (tenth) position for each Lot, the number of Contractors will fill the positions immediately following the position that they have tied for. For example, where two Contractors are tied in the sixth position, they will occupy the sixth and seventh positions. For example; where three Contractors are tied in the sixth position, they will occupy that sixth position as well as the seventh and eighth position respectively for the purpose of calculating the maximum number of Contractors in respect of the Lot in question. If less than ten Contractors meet the selection criteria to get on each Framework Lot, the Council reserves the right to proceed to establish the Framework with less than ten Contractors on each Lot or to cancel the procurement of that Lot. Further where a Contractor's total score (based on the technical and commercial award criteria) for a Lot ranks them within the top ten Contractors but is under 50%, then on the basis that the Council does not wish to compromise on the calibre of appointed Contractors, the Council reserves the right not to offer them a place on the Framework, and to proceed to award that Lot to less than ten Contractors.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete