Repairs to House of Lords Chamber Roof - Multidisciplinary Design and Associated Services

Award

Value

£1,957,876

Classifications

  • Architectural, construction, engineering and inspection services

Tags

  • award

Submission Deadline

1 year ago

Published

8 months ago

Description

Construction Professional Services for the Repairs to House of Lords Chamber Roof project including:
Lead Designer Services
Principal Designer Services
Architectural Services
Mechanical & Electrical Engineering Services
Structural Engineering Services
NEC Supervisor Services (for NEC4 ECC Contract)
Acoustic Engineering Services
Fire Engineering Services
and similar/related services
To support the project from RIBA Stage 3 to 7 from 2024 to 2030 (dependent on construction programme).

This was a further competition under Crown Commercial Services framework RM6165.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

CUE & Butterfly House Decarbonisation

The Butterfly House and Centre for Understanding the Environment (CUE) are located within the wider Horniman Gardens site, which is a Grade II listed Park and Garden. The CUE was constructed in 1995 and was originally intended as a temporary structure with an expected lifespan of 20 years. The Butterfly House was constructed in 2016. The Horniman wish to partner with a design and engineering supplier who will support the decarbonisation of the above listed buildings. Works include: Design works in line with RIBA stages 3-6: Main Designer role: - developing the outline design. - Determine the requirement on planning application and listed building consent. - detailed design drawing package. - prepare tender package and specifications for installation. - evaluate tender package and monitor and report on the cost plan. - appoint and manage the design team (M&E engineer, Structural engineer). - coordinate with the design team. - updating design while on site. - coordinate design changes. Project management and coordination: - coordinating the design development approval between the design team, The Horniman team and Salix (distributors of Public Sector Decarbonisation Fund Phase 4). - coordinating the works implementation & program between the museum team, the contractor and Salix. Principal Designer under CDM and Building Regulations: - Building control application preparation and submission. - PD duties for both CDM and Building Regulations. - PD duties for both CDM and Building Regs including the preparation and share of the Health and Safety File. - Organise Building control visit and share information at key stages. Contract Administrator (traditional route contract) or Employer's Agent (D&B contracts) - responsible for administering the construction contract including (non- exhaustive list): drafting contract documents for execution, issuing instructions, considering claims for extension of time, issuing certificates interim certificates for payment, practical completion certificates, etc

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Parliamentary Commercial Directorate

[email protected]

+44 (0)20 7219 1600

Timeline complete

Publish
Bid
Evaluate
Award
Complete