Tavistock Place Demolition

Award

Value

£202,385

Classifications

  • Site preparation work

Tags

  • award

Submission Deadline

1 year ago

Published

6 months ago

Description

To undertake the demolition of Former Museum Annexe and 38-39 Tavistock Place, PL4 8AX

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

The Windsor Boys' School D-Block Roof Replacement

The complete replacement of The Windsor Boys School D Block Roof. The roof has been split into 3 sections. The dimensions of the roofs are: Roof 1 - 800m2 Scope of works: • Strip existing tiles, felt & batten, renew with premium treated BS5534 - compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge tiles with Redland Concrete half-round ridge tiles and dry ridge kit. • Install new eaves trays, fascia vents and comb fillers. • Clear all waste and debris from site. • Scaffolding Roof 2 - 920m2 Scope of works: • Strip existing tiles, felt & batten, Renew with premium treated BS5534- compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge/hip tiles with Redland Concrete half-round ridge/hip tiles and dry ridge kit. • Remove existing verge & install new dry verge unit with end caps. • Remove existing valley & install new dry valley trough. • Install new eaves trays, fascia vents & comb fillers. • Replace all lead flashing as required. • Clear all waste & debris from site. • Scaffolding • Remove existing Velux rooflights and install 8no PK08 & 3no FPK08 Velux units with associated flashings. Roof 3 - 520m2 Scope of works: • Strip existing tiles, felt & batten, Renew with Premium treated BS5534- compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge/hip tiles with Redland Concrete half round ridge/hip tiles and dry ridge kit. • Remove existing verge & install new dry verge unit with end caps, • Install new eaves trays, fascia vents & comb fillers. • Clear all waste and debris from site. • Scaffolding All works must be guaranteed for 30 years

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete