Cost Manager for the New Leighton Hospital

Award

Value

£142,855

Suppliers

Classifications

  • Quantity surveying services

Tags

  • award

Submission Deadline

1 year ago

Published

1 year ago

Description

Mid Cheshire Hospitals NHS Foundation Trust ("MCHFT") issued an Invitation to Tender ("ITT") in connection with the competitive procurement of Cost Manager Services for the New Leighton Hospital.

The purpose of this procurement exercise was to appoint a Cost Manager to provide services covering RIBA Stages 2 to 3. The appointment is through to completion of the Outline Business Case which is currently targeted as July 2025.

The project is currently concluding RIBA Stage 1 and is due to commence RIBA Stage 2 in June 2024. The appointed Cost Manager is expected to commence services in May 2024.

The Authority reserves the right to extend the contract for the appointment of the Cost Manager beyond RIBA stage 3 (including Outline Business Case delivery) without the need for a further procurement exercise. In exercising its discretion to extend, the Authority will consider the successful bidder's performance up to the point it is considering any extension and whether any benefit to the overall programme to extending with the current supplier outweighs any potential benefit in carrying out a further procurement exercise.

Bidders were to note that the design may reach a fully complete RIBA stage 3 by the end of the Outline Business Case and therefore fees were to be based on this.

The Authority elected to follow the Open Procedure for this procurement exercise. For the avoidance of doubt, the form of the tender was conducted in accordance with the EC Treaty based principles of, inter alia, transparency, equal treatment and non-discrimination. Any organisation could have responded to the advertised Contract Notices, requested/downloaded the procurement documents, and submitted a tender. All tenders were evaluated in line with the methodology and criteria set out in the procurement documents.

This notice applies to Mid Cheshire Hospitals NHS Foundation Trust only and the Authority made use of the ATAMIS e-tendering Portal which can be found at https://health-family.force.com/s/Welcome ("the e-sourcing Portal").

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

IDT CONSULTANCY FRAMEWORK

The Contracting Authority wishes to procure a Framework with two (2) Integrated Design Teams for a multi-disciplined Integrated Design Team (IDT) to carry out the Services. This Framework is to cover Services in relation to Planned Maintenance Services and Repair Works which the Authority provides. The Framework Member(s) appointed to this Framework will be required to provide full Integrated Design Team Professional Services to Radius Housing Association. The Works that will be required include but are not limited to the following:- • Major refurbishment, rehabilitation, and damp remediation works. • Replacement/refurbishment of kitchens, bathrooms, doors, windows, heating systems, electrical wiring, and roofing (including structural alterations, roof lights, and cavity wall insulation). • Fire safety works, including upgrade/replacement of fire doors, compartmentation and fire stopping. • External works such as pathways, ramps, railings, parking improvements, and surface treatments. • Development works, including acquisition and adaptation of existing properties. • Internal/external redecoration and space reconfiguration. • General external works, including gutter/drain repairs, roof treatments, and cleaning. • Works to ensure compliance with the Disability Discrimination Act. • Works to ensure compliance with equality, accessibility, and safeguarding legislation. • Investigation of structural defects, with costed remedial recommendations. • Design and supervision of remedial works, including tendering support. • Sustainability projects, including EPC reporting, assessments, and improvement works. • Other maintenance and compliance-related works arising during the Framework term. The Works as outlined above and the Services associated with same, are subject to change dependent upon the requirements of the Contracting Authority and the nature of funding obtained and approvals received for each project. The Contracting Authority does not guarantee that any (or all) of the Services will be required or awarded under the Framework. The successful Framework Member will be required to advise as to whether Planning, Building Control approval and/or any other regulatory approvals are required for Works arising out of an appointment under the framework and will make representations to the relevant authorities in this regard. Completed projects must have a structural life expectancy of at least 30 years. The Authority's stock comprises a variety of house types including but not limited to Flats in Blocks and individual houses in the following categories: • General Needs accommodation, • Sheltered , • Supported Housing and Care Homes' sectors, • Hostels and • Office accommodation. The above outline of current stock is indicative only. Suppliers should note that at any time the stock may be increased during the Framework period by way of development, mergers, acquisitions or stock transfer from other Contracting Authorities.

Katy Reed

Published 1 day ago
Open

Professional Services and Development Framework

Scape Procure Scotland Limited (trading as SCAPE Scotland) is establishing a framework agreement for the provision of Professional Services and Development throughout Scotland. Experienced suppliers are invited to apply for one of 2 professional services and development lots for the provision of services within the built environment, infrastructure and development, as defined by the NUTS and CPV codes contained in this notice. SCAPE Scotland is establishing a framework agreement for the initial period of four (4) years with an option to extend by two (2) years which will run consecutively. The maximum duration is six (6) years which is a subject to the discretion of SCAPE Scotland. Applications are welcome from companies, consortium or joint ventures. Such parties must form a single legal entity prior to contract award in order to enter into contract. A maximum of 5 bidders will be invited to ITT stage. One supplier shall be appointed to each lot. This framework agreement is available for use by the public sector bodies (and their statutory successors) cited by name in Schedule 1 to the Public Contracts (Scotland) Regulations 2015 and additionally listed in the published Corrigendum to this notice and online at: https://scape-scotland.co.uk/site-information/framework-usage-eligibility. Due to character limitations, this Contract Notice will be followed by a Corrigendum to ensure the mention of all public sector bodies eligible to use the Framework.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete