Cost Manager for the New Leighton Hospital

Award

Value

£142,855

Suppliers

Classifications

  • Quantity surveying services

Tags

  • award

Submission Deadline

11 months ago

Published

4 months ago

Description

Mid Cheshire Hospitals NHS Foundation Trust ("MCHFT") issued an Invitation to Tender ("ITT") in connection with the competitive procurement of Cost Manager Services for the New Leighton Hospital.

The purpose of this procurement exercise was to appoint a Cost Manager to provide services covering RIBA Stages 2 to 3. The appointment is through to completion of the Outline Business Case which is currently targeted as July 2025.

The project is currently concluding RIBA Stage 1 and is due to commence RIBA Stage 2 in June 2024. The appointed Cost Manager is expected to commence services in May 2024.

The Authority reserves the right to extend the contract for the appointment of the Cost Manager beyond RIBA stage 3 (including Outline Business Case delivery) without the need for a further procurement exercise. In exercising its discretion to extend, the Authority will consider the successful bidder's performance up to the point it is considering any extension and whether any benefit to the overall programme to extending with the current supplier outweighs any potential benefit in carrying out a further procurement exercise.

Bidders were to note that the design may reach a fully complete RIBA stage 3 by the end of the Outline Business Case and therefore fees were to be based on this.

The Authority elected to follow the Open Procedure for this procurement exercise. For the avoidance of doubt, the form of the tender was conducted in accordance with the EC Treaty based principles of, inter alia, transparency, equal treatment and non-discrimination. Any organisation could have responded to the advertised Contract Notices, requested/downloaded the procurement documents, and submitted a tender. All tenders were evaluated in line with the methodology and criteria set out in the procurement documents.

This notice applies to Mid Cheshire Hospitals NHS Foundation Trust only and the Authority made use of the ATAMIS e-tendering Portal which can be found at https://health-family.force.com/s/Welcome ("the e-sourcing Portal").

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

British Museum Construction Professional Services Consultancy Framework

The British Museum is seeking to create a Framework for the provision of Professional Services Consultancy to its Estates and Capital Projects Department. The Framework will have seven lots covering the following disciplines: 1. Project Management 2. Quantity Surveying and Commercial Management 3. MEPhF Engineering 4. Architecture and Interior Design 5. Structural and Civil Engineering 6. Fire Safety Engineer 7. Surveying The types of projects and related planning and design activity likely to be delivered under the Framework are broad and could be classified under one of the following categories, covering both front-of-house and back-of-house spaces: 1. Strategic / technical studies or reviews. 2. Light touch refreshments / renewals (painting, minor carpentry, etc., but no significant fabric interventions). 3. Complex, stand-alone M&E / lift / security / fire systems renewal or refurbishment. 4. Refurbishment / renewal / creation of spaces (sometimes in conjunction with refurbishment of wings). 5. Masterplan projects including new buildings and / or significant reconfiguration of existing wings / spaces. The Framework objectives are as follows: 1. Safeguard value for money in the appointment of consultancy services for (construction) projects. 2. Ensure projects are delivered in alignment with budgets via securing the appropriate skills and expertise. 3. Guarantee the services delivered by the supply chain via the Framework are in alignment with the British Museum’s specialist context. 4. Ensure services delivered via the Framework are of high quality and aligned with clearly defined duties. 5. Provide programme assurance in project delivery via the appointment of those with the appropriate skills and expertise.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete