REPLACEMENT OF HEATING PLANT AND OVERHAUL OF EXISTING AC AND VENTILATION PLANT - AWARD
Buyers
Value
£0
Suppliers
Classifications
- Boiler installation work
Tags
- award
Submission Deadline
1 year ago
Published
1 year ago
Description
The complete works to provide replacement of primary heating system
boiler plant, along with amendments to the existing buildings: electrical
systems, HVAC controls systems, above ground drainage, domestic
services cold water, gas distribution and plant room ventilation systems,
etc, to enable the plant replacement.
The scope is also to include works to overhaul the existing HVAC
Controls, AC systems, and supply AHU ventilation systems serving the
building, with the intent to make existing HVAC controls, and AC fully
operational.
In addition, the works shall include for addition of new localised air
circulation fans to 3No meeting room 'booth' rooms, to ensure suitable
air movement and prevent stagnation of air in the rooms when in use.
The works shall include all Mechanical, Electrical, associated Builders
Works, making good works, structural works (if required) decoration
works, controls, etc, referred to herein and as shown on the tender
drawings,
For other General definitions pertaining to the Contract please refer to
the Contract Administrator Lead document.
Similar Contracts
Open
Published 1 week ago
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Timeline complete
Complete