Fusion21 DPS for Fire Suppression Systems & Associated Fire Safety Works

Award

Value

£736,310

Classifications

  • Fire-prevention installation works
  • Sprinkler systems installation work
  • Fireproofing work
  • Fire suppression system
  • Fire doors
  • Fire-protection devices
  • Fire-prevention services
  • Construction management services
  • Construction work for multi-dwelling buildings and individual houses
  • Sheltered housing construction work
  • Sprinkler systems
  • Fire suppression foam or similar compounds

Tags

  • award
  • contract

Published

1 month ago

Description

Fusion21 developed a Dynamic Purchasing System for the design, supply, installation, and maintenance of fire suppression systems & associated fire safety works. The DPS provides a flexible and efficient procurement solution for Fusion21 Members (including but not exclusive to property owners in the residential, education, health, local and central government sectors) to save money and generate social value.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

New Build Development Works & Associated Drainage, Infrastructure & Highways Works at Tudor Inn, Cimla, Neath

Tai Tarian is seeking to award a Contract for New Build Development Works & Associated Drainage, Infrastructure & Highways Works at Tudor Inn, Cimla, Neath, including managing demolition within an occupied area, to support Tai Tarian in the delivery of its development programme. The work comprises of the demolition of 2 existing properties to form access for the construction of 12 houses and 10 apartments and associated external works, drainage and incoming services. Tenderers should note that a site visit may be made at any time. Tenderers are responsible for obtaining any further information including inspection of the site (and will have deemed to have done so) to ensure sufficiency of your Tender. Tenderers must complete the Contract Sum Analysis (Appendix 2 – Contract Sum Analysis) in the format provided. A breakdown of the external works costs and preliminaries is also required. Collateral warranties will be required from all designers and will only be accepted in the format contained in Appendix 1 – Contract Documentation. Tenderers are reminded that it is expected that the Tenderers proposals will mirror the Employers Requirements. Any alterations must be clearly identified. A S104 Agreement will be required for the scheme. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees, surety costs and commuted sums. It is anticipated that a S278 Agreement will be required for the scheme. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees, surety costs and commuted sums. The client has commenced with the SAB application, and it is hoped that this will be in place prior to signing of contracts. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees but can exclude any surety costs or commuted sums. Tenderers should note that the specification documents must be complied with fully and no deviation from the listed items will be accepted, unless agreed with Tai Tarian prior to installation.

Tai Tarian Ltd

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete