Design, Installation, Operation & Maintenance of a District Heat Network within Hull City Centre

Open

Value

£125,000,000

Classifications

  • District-heating plant construction work
  • Network infrastructure
  • District heating boiler
  • Works for complete or part construction and civil engineering work
  • Construction works for power plants and heating plants
  • Heating plant construction work
  • District heating

Tags

  • tender

Submission Deadline

1 day from now

Published

1 month ago

Description

The Authority intends to appoint a Contractor to design and build (and to subsequently Operate and Maintain) a low carbon heat network and associated energy centre in the city of Hull. The heat network is intended to be expanded in future Phases. The requirements relate to Phase 1 of the Heat Network and the Energy Centre. Kingston upon Hull City Council  is conducting the procurement using  the Negotiated Procedure with prior call for competition in accordance with the requirements of Regulation 47 of the Utilities  Contracts Regulations 2016 (SI 2016 . 274) ) (UCR 2016). The Authority reserves the right to proceed with the award of the contract following the initial tender submission should it determine, at its sole discretion, that the bids received can be accepted without proceeding with the negotiated stage. It is intended to appoint a principal contractor for these works to start in early 2025, and for Phase 1 of the network fully completed by March 2028.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Contract 1 - Heating Installations - Programmed Works - 2025-27

The Authority invites suitably experienced Principal Contractors for the above Framework to provide a skilled service and provide the works for Heating Upgrades and Replacements This Framework Contract will ensure the availability of skilled Contractors to deliver the above Framework, requiring differing values and complexities as required during the Framework Contract. The Authority will require the successful Framework Suppliers to be acting the capacity of Principal Contractor under CDM regulations 2015 and the Authority will be the Client. The successful Framework Suppliers will be required to work together with North Tyneside Council (the Authority) to drive improvements and support the aims and ambitions of the Contract.. The following are the industry Standard Accreditation's required for this Framework and are a pass/fail question in the Standard Selection Questionnaire (SSQ) included in the full Tender documents: Gas Safe with ACS qualification and NICEIC or NAPIT The initial duration is for 2 years with up to 2 x 12 months extension at the sole discretion of the Authority. It is envisaged that 3 (three) successful Contractors will be appointed to the Framework. The main areas of activity may comprise of, but not exclusively be limited to; programmes or individual projects including housing/residential installing gas fired central heating systems and carrying out associated works for programmed works which are to be completed in ether of the following forms; houses, flats, bungalows and blocks and any other properties owned by the Authority or its subsidiaries which may also include housing for sale. Interested Suppliers must access the Tender documents for further information, which are available to download immediately after registering an interest in the North Eastern Procurement Organisation (NEPO) new ' OPEN' Portal system.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Mark Homersham

[email protected]

+44 1482613694

Timeline active

Publish
Bid
Evaluate
Award
Complete