SC22272 Arboricultural Works Term Contract

Award

Value

£0

Classifications

  • Agricultural, forestry, horticultural, aquacultural and apicultural services
  • Excavating and earthmoving work

Tags

  • award
  • contract

Published

10 months ago

Description

The arboriculture programmed works contract is required to ensure that KCC complies with its Duty of Care’ under the Highway Act 1980 and fulfils its obligations in Common Law as a land and tree owner.
The requirement is for the provision of highway tree works resulting from the Highway Soft Landscape Teams Tree Safety Audits.
The successful Contractor(s) will be required to facilitate both Tree Maintenance and Tree Planting for their awarded lot. A non-exclusive description of the works is provided below, but may cover other arboriculture works as required.
Tree maintenance: The service will provide for the removal of potentially hazardous trees and branches on both public and private property. The service will also facilitate removal of tree stumps and replacement tree planting. The service is provided primarily through programmed maintenance work with flexibility for additional ad-hoc provision. This service will include an additional provision for emergency tree clearance to supplement the primary ‘Emergency Tree Works Contract’ should extra resource be required during a declared emergency event.
Tree planting: The service will include tree planting within the highway environment. Tree planting will include provision for required regulatory replacement tree planting, and scheme/grant led planting including associated aftercare and young tree maintenance to ensure successful establishment. Tree size for highway planting is, typically, ‘heavy standard’ nursery stock ranging from 12-16cm girth and planting sites are a combination of both hard and soft surface environments.
This service will facilitate programmed and ad hoc tree maintenance works over a maximum eight-year period both on, and adjacent to the highway network, across the whole of the county.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Grounds Maintenance Contract

Read these instructions carefully before completing the Invitation to Tender Supplier Response document. It is your responsibility to make sure the document is fully completed with any other required documents. If you fail to comply with these requirements, we may reject your tender. 2.1.2 By submitting a response to this ITT, you confirm that you understand and can provide services (or works or goods) that satisfy the requirements described in our specifications. 2.1.3 Complete the following documents and submit documents directly to [email protected] • Appendix A - ITT Supplier Response Form • ITT sub-contractor information • Appendix B - Pricing Schedule & Specification If possible, please return these documents in the file format provided (e.g. .doc, .xls, etc.) or a compatible format. 2.1.4 See Section 4 for information about site visits. 2.1.5 You are permitted include appendices with your tender to support answers to the quality/technical questions in the Invitation to Tender Supplier Response document. Any additional documents you include should be relevant and, if part of your answer to a quality question, comply with any word count limits. 2.1.6 You are not required to submit copies of audited accounts, insurance certificates or company policies with your tender. If you are successful, you must provide these and any other evidence we request, before HTC enters into contract with you. 2.1.7 Tenders must be submitted by the Tender Return Date (see section 1.2). We will not consider late tenders unless agreed by the HTC's authorised officers in exceptional circumstances. 2.1.8 Tender Validity - your tender must be open for acceptance for at least 180 days from the Tender Return Date. We will not accept any changes to your tender in that period, unless a genuine error is found and corrected before we make the award decision. 2.1.9 Modification & Withdrawal - You may modify or withdraw your tender at any time before the Tender Return Date. If you need to withdraw your tender after the deadline, please send contact the clerk via email [email protected]. 2.1.10 Queries and Clarifications - All enquiries a bout this ITT should be sent by email to [email protected]. We will try to answer all questions as quickly as possible before the Clarification Closing Date. We recommend you submit your questions as early as possible.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete