Construction of essential highway infrastructure on a strategic transport corridor enabling residential development to the Southwest of Exeter. The main works elements include construction of:
A new road link (Chudleigh Link Road) between the existing Chudleigh Road and the A379.
A new signalised junction with the A379 and Chudleigh Link Road with associated widening of the A379 to provide two ahead lanes and a left turn lane northbound, plus two ahead lanes and a right turn lane southbound.
The improvement of the A379 Ellacott Road traffic signal junction incorporating widening of the A379 to provide two ahead lanes and a right turn lane northbound and 2 lanes in the southbound direction.
A new priority junction at the Chudleigh Link Road junction with the existing Chudleigh Road
The closure of the existing Chudleigh Road priority junction with the A379.
Improvement of the shared footway cycleway link along the A379 between Ellacott Road Junction and the A30 Overbridge.
The scope of work will incorporate: site clearance; ground improvement using deep soil mixing, bulk earthworks to construct new embankments and embankment widening, new road restraint systems, new surface water drainage infrastructure, new carriageway construction plus widening and resurfacing; the creation of new shared-use pathways, footways and traffic Islands; traffic signs and roadmarking works; civil works and ducting for street lighting and traffic signals, utilities diversionary works, landscaping and traffic management to facilitate the works.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Palmerston Play Area Refurbishment

The Vale of Glamorgan Council requires works to upgrade Palmerston Play Area in Gibbonsdown, Barry. The Council has secured Funding from the ‘All Wales Play opportunities Grant 2025-26. Capital grant for play spaces and playgrounds’. Tenders are sought from experienced contractors to design and implement works to upgrade the existing play area, which is in poor condition. The existing play area is set within Parks land adjacent to an existing MUGA. The site currently comprises of swings, a roundabout, a springy animal and a climbing unit. The area is well used by children from Palmerston Primary School. After consultancy exercises with the school, it was noted that the children would like accessible play equipment. The site itself can suffer from ground water flooding in low lying areas, so it will be necessary for all equipment to be installed at a similar or higher level than the adjacent pathway. There is one area in particular that floods and is highlighted in the attached appendices. Ideally the play equipment is to be grouped together so that it can be accessed from the pathways and from item to item. If the new area of surfacing for the new play equipment is greater than 100m2 over and above the existing surfacing, SUDS approval will be required. We require the contractor to suggest proposed drainage; the client will apply for the SUDS necessary. Items of equipment should not be above 4ms high. If this is the case Planning permission will not be required. Tenders are sought from experienced contractors to design and implement works to upgrade the play area. The scope of the work s includes the following activities: - • Design of new play area. • Removal of existing play equipment, surfacing and site furniture. (See Appendices). • Supply and installation of new play equipment, surfacing, site furniture and any other works to complete the approved scheme. • Provide access track for vehicles to the site to stop damage to fields. (As necessary, See Appendices). • Be free draining if possible and comply with SAB legislation if applicable • Reinstatement of site as necessary. All works must be undertaken in accordance with the Council’s brief and drawing supplied and approved by the Contractor.

Katy Reed

Published 15 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Miss Chloe Staddon

[email protected]

+44 1392381258

Timeline complete

Publish
Bid
Evaluate
Award
Complete