ISO 11 Incinerator life extension - Project Management

Award

Value

£100,000

Suppliers

Classifications

  • Construction consultancy services

Tags

  • award

Submission Deadline

10 months ago

Published

7 months ago

Description

The contract is for a single supplier to provide Project Management in relation to ISO 11 Incinerator life extension project at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF. 

PROJECT SCOPE AND OBJECTIVES
The primary objective of the project is to ensure ISO 11 has an incinerator available to operate, which is safe, reliable and will serve the building for a minimum of 10 years (Based on projected building lifespan). 
The project will address the issues identified in the HAZOP study as per Appendix 2 of the Outline Business Case.

There are a total of 12 (Twelve)  Work packages, not including Project Management within the overall project. The following 10 (Ten) Work Packages will require procurement and delivery under the scope of Project Management:
-	WP2: Replace Incinerator Control System with new Open Protocol system, compatible with current standards and compliant with HAZOP.
-	WP3: Replace Continuous Emissions Monitoring System (CEMS) and Secondary chamber Oxygen monitoring with new system(s), compliant with all current standards.
-	WP5: Incinerator kiln refractory lining upgrade to the Primary and Secondary Combustion Chambers.
-	WP6: Diesel fuel system upgrade and fuel tank replacement.
-	WP7: Carry out appropriate technical assessment, such as HAZOP, LOPA, SIL assessment.
-	WP9: Carry out upgrade to primary kiln catch box to where necessary.
-	WP10: Upgrade incinerator loading system hydraulics to make compliant with current standards and to add provision of manual override.
-	WP11: All necessary commissioning and necessary environmental testing (QAL 2 examination under Waste Incineration Directive). Update of all existing statutory licenses and environmental permit (enforced with Guildford local council).
-	WP12: The Principal Contractor and Designer roles under Construction Design Management regulations: 2015 + design consultancy.
-	WP13: Legal representation to assist with the various contracts.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete