WP3921 - Parks Regeneration - Lot 1 - Walsall Outdoor Gyms - AWARD

Complete

Value

£0

Classifications

  • Engineering works and construction works

Tags

  • awardUpdate

Submission Deadline

1 year ago

Published

7 months ago

Description

Walsall Council are seeking to procure a single provider to design and deliver the implementation of 5 outdoor gym facilities across the Walsall Borough. The council have identified the following 5 sites for this project: 
       
      Aldridge Airport 
      Walsall Arboretum 
      Pleck Park 
      Holland Park 
      Pelsall Middle Common 
      
      
      The works associated with this project will include but not be limited to the following elements: 
      The design of the sites 
      Procurement of gym equipment 
      Preliminary works 
      Installation of gym facilities at each of the sites 
      Post installation considerations 
       
      Whilst the requirements apply to each park, for the purpose of this tender, only the design submitted for Aldridge Airport will be evaluated and used to determine the overall project award. This design will be replicated across the 4 other remaining sites. However, it is important to note that the infrastructure and Preliminaries work will vary slightly for each site, this will be separately described and identified within the pricing schedule.  
      Dependant on approval, the design for Walsall Arboretum may require amendment following award to the successful bidder.  
       
      The procurement process being used is a mini-competition under ESPO 115_21 - OUTDOOR PLAYGROUND, FITNESS & SPORTS FACILITIES AND EQUIPMENT LOT 7

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Helen Bakewell

[email protected]

01922 658471

Timeline complete