ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement

Open

Value

£450,000

Classifications

  • Waste incinerators

Tags

  • tender

Submission Deadline

2 weeks from now

Published

1 week ago

Description

Design and Build of Work re. Incinerator Kiln Refractory Lining replacement for the Primary and Secondary Combustion Chambers.

The scope of works will involve:
• Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation.
• Supply and delivery of all refractory materials and anchors including any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops.
• Deconstruction of existing refractory lining and Anchors (Disposal of waste by others)
• Installation of the new anchors and refractory lining as per agreed detailed design.
• Management of drying out and curing of the lining.
• Management of all subcontractors employed by the supplier to complete these works.
• Submission of O&M containing all required details as per PIF and separate section to provide information needed for the Health and Safety File.  Please see Contract Scope section in ITT document.

Additional information: Please note that Appendix H - Confidentiality Agreement must be completed, signed, and emailed to [email protected] asap. Then and only then will access to the full ITT package (Appendix E1 - Site Documents, Appendix E2 - Incinerator Dimensions and  Appendix E3 - Front Plate Technical Datasheets) be granted to the requester.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete