Playing Pitch and Built Facilities Strategy

Award

Value

£30,000

Classifications

  • Recreational, cultural and sporting services

Tags

  • award

Submission Deadline

1 year ago

Published

1 year ago

Description

Castle Point Borough Council is preparing a local plan for its area. This will be called the Castle Point Plan and will cover the period 2023 to 2043. 

A vision led place-based approach is being taken to the Castle Point Plan, with the needs of the community and the needs of those organisations providing services and facilities to the local communities being at the fore of what how places change and grow.  

A critical component of the Castle Point Plan will be the approach taken to ensuring that residents can be healthy and live well. Sporting facilities and playing pitches have a role to play in providing these opportunities, as well as informal opportunities for recreation such as the use of green spaces. 

A Playing Pitch Strategy (PPS) and Indoor Built Facility Strategy (IBFS) were last prepared in 2018 and set out action plans for improving the quantity and quality of pitch and sport facility provision in Castle Point. Updates from sports' governing bodies were collected in 2022 and 2023 to inform updates to the action plans within these strategies. 

Additionally, a PPS steering group comprising representatives from different sports' governing bodies as well as Sports England and Active Essex meet bi-annually and liaise outside of meetings to facilitate delivery of actions arising from the strategies.
In order to inform the emerging Castle Point Plan, a new Playing Pitch and Sports Facilities Strategy is required that provides a comprehensive update to the work undertaken in 2018. The new strategy should take a place-based approach to the consideration of needs and provision and should be informed by strong community and stakeholder engagement. This strategy is aimed at different stakeholders and the strategy should be adaptable to enable the use of the document for different needs. For example, the council will be preparing a recreation strategy and work from this strategy will feed into that workstream. 
Quotes are sought from suitably qualified and experienced specialists in the planning of playing pitch and sports facilities to undertake this work.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Callington Skate Park

Construction Plan 1. Scope of Works. The works will include: • Site preparation and demolition of existing fence. • Earthworks, grading and sub-base preparation. • Installation of drainage systems. • Construction of reinforced concrete skatepark elements (bowls, ramps, platforms, coping). • Installation of street-style features (rails, ledges, stairs). • Perimeter works including pathways and landscaping. • Site clean-up, quality checks, and handover. 2. Methodology 2.1 Mobilisation • Establish site compound, temporary fencing and signage. • Set out works in accordance with approved design drawings. • Conduct pre-start meetings with subcontractors and suppliers. 2.2 Site Preparation • Clear vegetation, debris and unsuitable materials. • Carry out excavation to design levels. • Import and compact subgrade fill where required. 2.3 Drainage & Utilities • Install sub-surface drainage to prevent water pooling. • Connect to existing stormwater infrastructure. • Install conduits for future lighting and services. 2.4 Concrete Works • Coping and edging hot dipped galvanised. Cut ends to be treated with corrosion resistant paint system • Formwork, steel reinforcement and shotcrete application for bowls and ramps. • Machine finishing followed by hand-trowelling for smooth riding surfaces. • Expansion joints, coping stones and steel edges installed. 2.5 Ancillary Works • Install prefabricated hot dipped galvanised rails, ledges and modular features. • Construct pathways, seating areas and viewing zones. • Landscape the surrounding area. 3. Health, Safety & Environmental Management • Works to be carried out in accordance with [local construction safety legislation]. • Dust suppression and noise control measures. • Daily toolbox talks and risk assessments. • Waste management and recycling plan. • Public safety maintained through secure site fencing and restricted access. • Working hours 0800 to 1700. • All operatives working on site should have relevant CSCS cards.

Katy Reed

Published 15 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete